Ed Pheil (@EdPheil) profile picture

https://nitter.gq/t.co/vtyTpYA3Gp, Interested in Nuclear Fission & Fusion, e.g. MSRs, PbBi Rx's, Polywell P-B11 @ EMC2, Silicone Accelerator, Fisonic Pumps, Quantum cpu's

Esperance, NY USA
Joined February 2012
We are grateful to Under Secretary Brandon Williams for his leadership, to @ENERGY @ARPAE for setting the foundation, and to our partners at TLG. We are determined to build an American fuel supply that future generations can depend on! – at Rollingwood, TX
President Trump has made it clear: a strong nuclear industrial base is key to American energy dominance. @ENERGY announced up to $50 million for 8 projects through @ARPAE's HORNIG program to advance nuclear fuels. Great to join @exodysenergy in NY to celebrate their selection! More here: arpa-e.energy.gov/news-and-e…
3
6
263
Today we are proud to announce that Exodys has been selected for an award under the @ENERGY's @ARPAE HORNIG program. In partnership with TLG Services, we will build a common framework to assess the cost, feedstock, and logistics of recycled transuranic (TRU) fuel, helping bring advanced nuclear fuels to market. HORNIG supports President Trump’s push to rebuild the U.S. nuclear industrial base and put domestic nuclear resources to work. For Exodys, that means turning America’s used nuclear fuel from a multibillion-dollar liability into a generational asset. Thank you to Under Secretary for Nuclear Security Brandon Williams, TLG, and Pillsbury for joining us on this achievement.
🤖 Made with AI
1
5
2
16
1,505
Politico removed the paywall on the @generalmatter story 👀 link in comments Looks like they’re making just as much paper progress as their peers: “multiple contracts with advanced reactor companies like X-energy and Antares Nuclear, the U.S. government, and major American utilities already operating nuclear plants”
🚨 Someone finally got a peek under General Matter’s hood Biggest takeaway from Politico: General Matter “offered 355 metric tons of HALEU annually for the $900 million. With its $900 million, Centrus said it would initially deliver 12 metric tons annually and subsequently scale up.” That’s in reference to the DOE enrichment awards earlier this year. I’ve said this repeatedly that Centrus $LEU is moving too slow with their build out and their capacity goals are way too low. Glad to see a company that both recognizes the problem and is working to solve it, not just do some patch work 🤘 Article also says General Matter’s enrichment technology reveal is going to happen in the coming months!
5
6
107
16,668
Last week during Climate Week NYC 2026, our CEO @CarllPerez joined Gayatri Karnik of Supercritical and moderator Isuru Seneviratne of LucidCatalyst at Nuclear Symposium 2026 to discuss the nuclear fuel cycle, from uranium sourcing to recycling. Expanding nuclear power means building the infrastructure to fuel it. For Exodys, that includes turning America's used nuclear fuel from a multi-$B liability into a generational asset. At Newlab's New Climate Futures, our CFO Viola Aureggi (@VAureggi) gave visitors a closer look at that work, with a physical model of our planned recycling facility on display at the Startup Showcase. Thank you to @nuclearny and @Newlab for hosting, and to our investors at New York Ventures for including Exodys in the showcase. #ClimateWeekNYC
2
3
1
8
884
In the early 1970s, General Electric invested $64M (~$450M today) to build the Midwest Fuel Recovery Plant in Morris, Illinois. It was designed to recycle 300 metric tons of used nuclear fuel a year, but it never processed any. Morris used Aquafluor, which began with water-based separations and was intended as a more compact alternative to PUREX (Plutonium Uranium Redox EXtraction). After dissolving the fuel, one solvent-extraction cycle would remove most fission products, and ion exchange would separate plutonium and neptunium from uranium. Rather than add extraction cycles to purify the uranium, GE turned to fluoride volatility. The partly purified uranyl nitrate solution was heated into uranium oxide (UO3) powder in a fluidized bed, where gas keeps particles in motion. A second bed converted it to uranium hexafluoride (UF6), which could leave as a gas, separating uranium from remaining impurities. This brought fluorination forward, before final purification. The chemistry was sound, but handling those powders with remotely operated equipment proved harder than the design assumed. During cold (nonradioactive) testing, fine uranium powder clumped together and repeatedly clogged the fluidized-bed units used to turn the solution into powder, then into gas. By mid-1974, GE concluded the plant was not operable as built. A fix would take years and cost more than the plant had, so they stopped reprocessing and Morris became an Independent Spent Fuel Storage Installation (ISFSI) facility. By the time Ford and Carter deferred commercial reprocessing, equipment failures had already ended the recycling project. GE had a long industrial record for water-based separations at Hanford, Savannah River, Idaho, and West Valley. Fluoride volatility had a different track record: Atomic Energy Commission laboratories had demonstrated it at pilot scale with unirradiated fuel, but only at laboratory scale with irradiated fuel. There was no industrial precedent for that separation step on irradiated material. GE also lacked today's powder-simulation tools and range of proven remote-handling equipment. Cold testing in the completed plant became the first real test of the design. Morris showed how unforgiving industrial-scale operation can be, even when the chemistry works at the bench. That lesson informs how Exodys builds on the industry's operating heritage. UPCYCLE draws on five decades of industrial aqueous recycling experience at La Hague (France), Sellafield (UK), Tokai and Rokkasho (Japan), keeping the material in liquid form until purification is complete. Fluorination to UF6 comes last, applied to purified uranium, much like the conversion process used industrially for seventy years. Each step stays within conditions proven at scale. A full-scale cold prototype will then test how those steps work together under remote operation before we build the plant.
1
3
8
240
Advanced nuclear deployment depends on more than a sound design, it requires fuel cycle coordination. This was one of the key lessons from @CarllPerez's recent conversation with @UCANPowerDC. The Standard Contract makes that gap concrete. In exchange for utility fees, DOE agreed to accept, transport, and dispose of commercial spent nuclear fuel. Services were to begin by January 31, 1998. DOE missed that deadline. Recycling offers a different path, but only if it works as an operating business. A recycling facility’s economics are dominated by fixed operating costs. The commercial discipline, as Carl puts it, is to “maintain an order book that justifies every single one of your lines.” That is why Exodys begins with today’s operating fleet. Because 96% of used nuclear fuel can be recycled, reprocessed uranium already has a bankable market. Modular capacity can scale with contracted utility demand. Advanced reactor fuels become a larger market as reactor deployment, fuel qualification, fabrication capacity, and credible offtakes mature together. Building this capacity requires teams focused on rapid, industrial-scale execution, a mindset woven into our DNA. The Fukushima account shows this exact operating mindset. After the 2011 accident, our CTO, Jean-Christophe PIROUX, worked on AREVA’s emergency response to contaminated water. The system moved from development through installation and testing in under three months. That experience matters. Advanced nuclear needs teams that can solve urgent industrial problems, not only design future systems. Reprocessing is one link. Recovered material must become qualified fuel. Fabricators need bankable demand. Reactor developers need dependable supply. Contracts, qualification, capacity, and deployment must move together. Carl’s standard is clear: serve ratepayers and the American public with infrastructure that operates, scales with demand, and lowers the cost of reliable power. Thank you to the UCAN Power team for a thoughtful conversation. (Full interview in the comments below.)
1
2
5
181
In 1966, Nuclear Fuel Services began operating a commercial fuel recycling plant at West Valley, New York. Over six years it processed ~640 metric tons of used nuclear fuel (UNF), and it remains the only commercial reprocessing plant ever to operate in the United States. What it proved, and what it cost, shaped what came after. The proof came first. A privately operated plant received, sheared, dissolved, and separated commercial UNF, and delivered recovered products. The core chemistry performed as designed. The lessons came from the plant's limitations. West Valley was built small, with a nominal capacity of ~300 tons a year, which left thin operating and financial margins. Nuclear Fuel Services shut it down in 1972 for a planned capacity upgrade, and while it was down the regulatory requirements were substantially rewritten. A small asset base against a moving compliance target ended the project. The plants that followed internationally, La Hague above all, were built at several times the scale, with design margins and parallel processing lines that could absorb regulatory and technical change. The cleanup that followed was expensive, more than $3.1B in federal spending to date, and it deserves to be counted honestly. It also deserves to be credited in other areas, because it produced foundational operating experience. Between 1996 – 2002, the West Valley Demonstration Project carried out America's first operational high-level waste (HLW) vitrification campaign, locking 24M curies of liquid waste into 275 stainless steel canisters of stable glass and shipping 19,000 drums of treated low-level waste off site for disposal. The U.S. improved fission product waste management at West Valley, and vitrification is now standard practice at commercial recycling plants worldwide. The most durable design lesson from the cleanup is clear: never accumulate liquid HLW without a conversion path, and design the waste treatment train into the plant from the beginning rather than building it afterward. Exodys has studied West Valley closely, and its record shows up directly in our design. We are sizing for enough scale to carry fixed costs, in a modular plant that can grow without shutting down the production line, with waste treatment and stable waste forms in the flowsheet from day one. The country has already paid for those lessons. We are spending them to build a robust domestic, circular nuclear fuel economy.
1
3
1
5
1,619
Nuclear fuel recycling is often called a foreign technology. The historical record shows the opposite. It was invented, first industrialized, and first operated at scale in the United States. Industrial-scale chemical separation of used nuclear fuel began in 1944 at Hanford's T Plant, the first of its kind in the world. It ran the bismuth phosphate process, a batch method that recovered plutonium and nothing else. The PUREX solvent extraction process that replaced it was conceived at Knolls Atomic Power Laboratory in 1950, piloted at Oak Ridge in 1952, and in production at the Savannah River Site (SRS) by 1954 and Hanford by 1956. Those plants processed tens of thousands of tons over decades, building unmatched separations experience. PUREX remains the foundation of every reprocessing plant built since, including La Hague in France and the Rokkasho plant Japan is preparing to bring online. France spent 60 years at La Hague developing its own flowsheet, equipment, and operating practice. The chemistry started in the U.S. but it did not stay here. What stayed behind was Hanford's legacy. Hanford was a weapons production complex, not a commercial fuel recycling facility. Its mission was plutonium for the defense program; its waste practices followed from it. Liquid high-level waste went to underground storage tanks, 177 of them: 149 single-shell (1943–1964) and 28 double-shell (1968–1986). The waste grew to ~56M gallons, and around 60 of the single-shell tanks are confirmed or presumed to have leaked. A treatment pathway only came online in October 2025, when the site began turning tank waste into glass, low-activity first. That accumulation, not the separations chemistry, sits at the center of a cleanup program with lifecycle estimates of $364–590B. The commercial industry learned from it. West Valley Reprocessing Plant repeated the pattern, then in remediation demonstrated industrial-scale high-level waste vitrification in the U.S., finishing its entire liquid inventory as 275 canisters of glass (1996–2002). SRS has run continuous vitrification since 1996, filling 4,500+ canisters. La Hague has done the same since 1989. Modern recycling plants build waste treatment from the start, the direct answer to Hanford's tank farms. Conflating the two is a category error. One is the legacy of a mid-century weapons program; the other, a mature industrial process built around its central lesson. This history defines both the opportunity and the method. Our UPCYCLE process is built on actinide co-recovery chemistry descended from this lineage, updated with the engineering, waste treatment, and safeguards informed by 80 years of global operation. The U.S. developed this capability once, and the technical basis for rebuilding it is stronger than ever before. Reindustrializing American nuclear fuel recycling is no longer a scientific problem; it is a supply-chain coordination exercise—one Exodys was built to run.
2
3
1
7
539
Always a great time in the motor city for the Exodys team. Reindustrializing America will require more energy than this country has ever had to make—and that’s why we came to Detroit. Everybody at the @reindsummit was there for the same reason. To re-build and onshore industries that this country gave up on. Now at Exodys, we will re-valorize what was perceived as ~100,000 tons of “waste” into fuel that can power our country for centuries.
1
9
322
Oil powered the last industrial age. Uranium will power the next. Thanks to the team at Omoi for giving our story a visual language.
3
1
5
327
Today we are re-introducing Exodys. A multi-national team that pivoted from advanced reactor development, to become America's nuclear recycling company.
1
6
1
15
970
Chuck Norris' ranch was nuclear heated & powered, but his reactor didn't need a critical mass of fissile or even fissile to fission uranium, because he just stared at the Uranium, and it split in fear.
10
283
When I was on nuclear my electricity rates were going down 20% 15 years then they started installing iRenewables and my electricity prices went up 80% and 15 years. Take the blinders off!
I’m tired of having to repeat this but it still hasn’t sunk through to my economically illiterate colleagues. Clean energy is cheap energy. Attack one and you attack the other. Why not have both? washingtonpost.com/climate-e…
1
1
16
846
Repeating incorrect info is not a reason to catch on. Take the blinders off!
12
344
I can't unredact anything. But check slide 12. Slide 13 is also awesome. ;) nrc.gov/docs/ML2211/ML22112A…
1
1
9
392
Since U seawater extraction was economic relative mining before the recent U price quadrupl8ng, why os China the only country pursuing a seawater U extraction plant?
11
3
2
34
2,545
Rod Adams chose to increase his & my echo chamber effects, by banning me, because I called him out on an anti-large reactor post he posted yesterday.
6
2
17
2,483