Idomac (@Idomac2) profile picture

Power System Engineer, Founder, Association of Nigerians working in the UK Power Sector.

Joined December 2015
Photo by Idomac (@Idomac2)
Pinned Tweet
1/ PUNCTURING THE EXCUSE: 7 QUESTIONS NISO MUST ANSWER 🧵 NISO said: "Current Low Power Generation - gas constraints, reduced hydro output" Gas + low water happen EVERY year. If it happens every year, it is not an excuse. It is a policy. Here are 7 questions:
4
9
1
14
3,377
1/10 Grid Failure. I did not guess. I studied and practised in the UK. I read the room. I warned in 2018 and 2020 that GenCos would shut down. In 2026 it happened. This is the story. 🧵 #PropheticDeclarations
2
7
1
20
4,282
10/10 Free for Nigeria to adopt. Attribution required. Not free to rebrand. Please share with @officialABAT #BandingConundrum #From5HoursTo12 #PropheticDeclarations #IdowuOyebanjo #SuperGasToPowerProtocol
1
1
403
Idomac retweeted
Replying to @Idomac2
We have incompetent and inexperienced people in our power sector. This is a worthy and enlightening read
1
1
22
Idomac retweeted
“Nigeria is experiencing a national disruption because we built a concentrated system, we stopped investing in it, and we built no Plan B.”
2
1
33
1/6 You cannot promise what you do not control. Nigeria's banding system charges Band A for 20 hours, but DisCos don't control generation or transmission. That is #TheBandingConundrum
2
4
6
1,105
5/6 Solution = supply-accountable reform: Publish hours. Attribute failure. Automatic credit. Enforce what already exists. ORDER/NERC/2026/091 Para 19e already says: fail 7 days = automatic downgrade. Enforce it.
1
95
6/6 The measure of reform is not how much more we pay. It is how much more reliable power we receive. #From5HoursTo12Hours
1
1
1
89