⚡️ ELECTRICAL INSTALL ⚡️
Mse are installing all new electrical infrastructure and back up generator at a large pharmaceutical and technology distribution warehouse in the Midlands.
Our engineers have made very light work in terminating the 150mm 4 core SWA!
☀️❄️ AIR CONDITIONING INSTALLATION ❄️☀️
MSE have done an incredible job with this air conditioning installation.
A full install of indoor wall mounted units and outdoor units in the brand new Portakabin buildings.
Hopefully this hot weather will make an appearance soon! ☀️
🚧 DEMOLITION DAY 🚧
MSE have helped to complete a full demolition of an old classroom building.
All of the doors, internal walls and skirting were removed and disposed of accordingly in our on-site skips ♻️
The site is now clear of all debris and our safety fences/barriers have been removed, all ready for the schools brand new classroom building to be installed over the Summer ☀️
#demolition #building – at Redditch, England
⚡️ Distribution Boards ⚡️
We have completed a Distribution Board change at a prestigious brassware company in central Birmingham.
MSE are supporting our client in a phased distribution upgrade throughout the site, helping them stay compliant whilst causing minimal disruption. – at Birmingham, England
🚗🔋ELECTRIC VEHICLE CHARGERS 🔋🚗
MSE have completed a full installation of 4 car chargers that have 2 charging outlets each! This includes the concrete plinths and barriers, routing kit for the chargers and underground cable containment.
#EV #chargingstation #electricvehicle – at Redditch, England
🥶🥵 Air Conditioning Installation 🥶🥵
An indoor air conditioning unit and outdoor air conditioning unit has been installed by our Air Conditioning Engineers at a busy restaurant in Birmingham last week.
They’re now ready for the hot weather to make an appearance!! – at Birmingham, England
Bring on the summer ☀️☀️☀️
Are you in need of some new air conditioning units ready for the summer? Get in touch today to book your free, no obligation quote.
📞 01527 582 730
📧 [email protected]
#birmingham #airconditioning #summer – at Birmingham, England
👷♂️ BUILDING PROJECT 👷♂️
MSE Building Division have completed something a little different recently.
Our Skilled Workers have welded and reinstated some basketball hoops 🏀 at a school in Shrewsbury.
All ready for the children’s summer sports ☀️
Swipe for the before and after!
✅ COMPLETED PROJECT ✅
MSE have now completed a full MEP refurbishment at a telecommunications training centre near London.
The complete refurbishment package included a new distribution, containment, point of use heaters and a full VRV system.
⚡️ HEATER CONTROL BOXES ⚡️
MSE have designed and constructed site specific Heater Control Boxes. We have installed these throughout the West Midlands.
Heater Control Boxes maintain temperature levels to equipment and machinery at a specific level
🏅 Constructionline Gold 🏅
We are pleased to announce that MSE are now a member of Constructionline Gold!
Constructionline Gold is just one of the many accreditations we hold.
We are ISO 9001 and ISO 14001 accredited along with Safecontractor and CHAS.





































