⚠️Upcoming Tree Pruning Work ⚠️
Crews will be working nightly along the shoulder at various locations to do tree work
🟡Nov 16-18 from 9pm-5am N/B & S/B Taylor Way
🟡Nov 19 from 9pm-5am @ Lynn Valley E/B on/off ramps
Shoulders will be closed. Please watch for crews. @DriveBC
111
#BCHwy99 remains closed north of Mount Currie due to flooded and washed out roads.
Please avoid the area of #MountCurrie. Please respect barriers and all traffic control personnel. @DriveBC
88
⚠️Pemberton & Mount Currie ⚠️
Due to rising river levels many areas along #BCHwy99 are seeing water on the road.
Please avoid the area if possible & follow all traffic control signs.
1
138
⚠️Heavy Rain Warning🌧️
Heavy rain is expected to start early Tuesday morning till Wednesday, Nov 10-11, on the #NorthShore along #BCHwy1 including #NorthVan & #WestVan
#Squamish to #Whister can expect very heavy rain during this time
Heavy rain will cause pooling on the roads &visibility can suddenly be reduced. Please drive to the conditions @DriveBC
168
🌧️HEAVY RAIN & STRONG WINDS EXPECTED IN NORTH & WEST VANCOUVER🌧️
A significant rainfall event is expected Thursday night (Nov 5) into Friday (Nov 6).
Up to 80 mm of rain for higher elevations on the North Shore and around 50 mm at lower elevations.
The BC River Forecast Centre has issued a High Streamflow Advisory. Heavy rain can cause pooling on the roads. Please drive to the conditions and turn on your lights. @DriveBC #NorthVan #WestVan
202
🚧UPCOMING DANGER TREE REMOVAL
Crews will be removing danger trees alongside #BCHwy1 nightly at multiple locations from Nov 2nd to Nov 6th from 9:30PM to 5:00AM
Locations are:
EB on15th St onramp to 21st St onramp
WB on 15th St onramp
EB & WB Lynn Valley offramp
Please slow down and watch for crews. @DriveBC #westvan #northvan
113
Crews will be catch basin cleaning along #BChwy1 from #HorseshoeBay to Taylor Way (EB and WB)
Dates: Oct 26th - 29th from 10pm -5am
Please watch for slow moving vehicles and stopped vehicles along the shoulder.
@DriveBC #WestVan #NorthVan
137
🚧UPCOMING ROAD MAINTENANCE – MT. SEYMOUR ROAD
Oct 27-30: Crews will be installing a culvert on Mt. Seymour Rd at the 6km to 8km mark from 7:00AM-4:00PM
Traffic will be reduced to single-lane alternating traffic. Please watch for crews working in the area.
@DriveBC @Mt_Seymour
#NorthVan #WestVan
79
UPDATE:
Work on the Iron Workers Memorial Bridge will be extended.
When: Oct. 27, 28 & 29, from 10PM to 5AM.
Please slow down and watch for crews.
@DriveBC
1
122
🚧UPCOMING BRIDGE MAINTENANCE
Overnight bridge inspection on WB #BCHwy1 on October 22 from 10PM to 5AM.
Starting at Capilano River Bridge – the WB Right lane will be closed.
Then moving to Mosquito Creek Bridge – the WB on ramp(3rd lane) will be closed.
Please watch for crews and slow moving vehicles. @DriveBC
89
🚧UPCOMING PAVING OPERATIONS
Paving operations on Taylor Way are scheduled for Oct. 19 & 20 from 9PM-5AM. Expect lane, side-road &intersection closures in both directions.
Traffic will be counter flow. Delays are expected. Please plan ahead & allow extra travel time
2
137
🚧UPCOMING ROAD MAINTENANCE – MT. SEYMOUR ROAD
Crews will be installing a culvert on Oct 19-23, from 7:00AM-4:00PM, on Mt. Seymour Rd at the 6km to 8km mark.
Traffic will be reduced to single-lane alternating traffic. Please watch for crews working in the area.
@DriveBC @Mt_Seymour
#NorthVan #WestVan
97


















