New effluent isolation and check valves installed for a customer.
The objective: dependable flow control, backflow prevention, and easier isolation for future maintenance.
Small infrastructure upgrades like this support safer, more reliable wastewater operations.
When SCADA goes dark, operations still have to continue. Cyber resilience requires trained operators, tested SOPs and manual control.
Today, we remember and honor the service members who gave their lives for our country. From all of us at O&M Solutions, we remember and honor them.
Submersible pump station rehab with new screening baskets and cover modifications. Small upgrades like this help reduce clogging, protect pumps, and make maintenance easier.
New booster pump install in the field.
Pressure issues can point to aging equipment, poor control, or deferred maintenance. O&M Solutions helps water and wastewater facilities keep critical systems reliable.
Pump station failures are often system problems, not single-component problems.
Mechanical condition, electrical controls, VFDs, and SCADA data need to be reviewed together.
Read more from O&M Solutions:
oandmsolutions.com/blog/how-…
Ignore a wet well and it will fail. Cleaned, restored floats, added bracket for reliability and service access.
Routine maintenance prevents expensive problems.
Water booster pump replaced. Old unit showed wear and corrosion. New system online and operating as intended.
Fragmented wastewater O&M creates risk.
A full scope partner integrates ops, maintenance, and compliance to improve reliability and asset life.
Read more: oandmsolutions.com/blog/what…
Backflow testing in the field. Verifying protection of potable water through pressure testing and compliance checks.
Submersible pump pulled due to heavy ragging. Wipes and debris clog systems, reduce performance, and lead to failure.
New Jersey’s blizzard was a real stress test for small municipal plants. Storms reveal what maintenance hides. If this one exposed gaps, we can help.
Fire at Wilmington wastewater plant highlights operational risk.
Strong O&M programs reduce failure exposure and protect public health.
cbsnews.com/philadelphia/new…
Rate cases aren’t popular, but they reflect a reality: aging infrastructure, compliance costs, and rising operating expenses across NJ. The question is about how well systems are operated and maintained. Strong O&M supports reliability and responsible long-term cost control.
In 1966, President Lyndon B. Johnson signed the Clean Waters Restoration Act, expanding federal support for sewage treatment plants.
Today’s wastewater infrastructure stands on that foundation.
Fragmented maintenance drives risk, higher costs, and compliance issues in aging wastewater systems. Integrated O&M improves control and reliability.
oandmsolutions.com/blog/frag…
Federal funding is flowing. Operations will determine whether those investments succeed long after construction ends.
tenney.house.gov/media/press…
Storm passed. Extreme cold remains. Freeze risks are now operational risks for water and wastewater systems. If you need support during this cold stretch, we are ready. oandmsolutions.com


















