This job, undertaken for Brennan at a private property, involved surfacing a new driveway as part of a new build home. For this, we installed 330 square meters of open graded base course.
For this project, alongside Terrasite, we were asked to install DBM base course over 205 square meters of pathways within a new section of this development.
For this project, based on Longwater Land, we were asked to resurface footpaths as well as a few driveways, in total this equalled approximately 1200 square meters. To do this, we used HRA surface course in two layers.
We were lucky enough to undertake installs within Wickford Train Station, on behalf of Walker Construction. For this, we carried out approximately 300 square meters using various materials over multiple visits.
For this private customer, based in Ipswich, we were asked to complete a resin install within their driveway. This area equalled 134 square meters, in this are we laid an open graded base course followed by a bronze resin surface course.
Kier have given us the opportunity to work throughout their Norwich contract, which involves resurfacing footpaths and roadways. Most recently, we carried out footpath reinstatement in Bramerton. We laid, 470 square meters of AC20 and AC6, all after reinstating the kerbs.
We've carried out a lot of work down at New Holland Tractor Plant in Basildon. The latest work completed there, involved planing and reinstating a 321 square meter area. We used 40mm SMA wearing course to resurface this area.
This project, undertaken on behalf of ATB Construction, took place within Bethnal Green. A small area resurfaced in preparation for storage containers. We installed 188 square meters of AC20 base course and open graded surface course with PMB.
This project, undertaken for Barnack, involved surfacing a new area based within Cygnet Park Industrial Estate. For this, we laid AC20 and AC6 within footpaths, as well as AC32, AC20, HRA and SMA wearing course on the entrance road.
This project, undertaken for Barnack, involved surfacing a new area based within Cygnet Park Industrial Estate. For this, we laid AC20 and AC6 within footpaths, as well as AC32, AC20, HRA and SMA wearing course on the entrance road.
Recently, we undertook work for Albright Construction at Broomstick Hall Rd. For this, we had to plane out 422 square meters before laying SMA with PMB PSV68. This install took 3 days due to limitations of the road closure.
This project involved resurfacing a pathway within Maldon Promenade. For this, we installed 350 square meters of open graded base and wearing course.
Recently, a private customer reached out to Tay-dal to ask for our assistance in relaying a private enclosed driveway, based in Colchester. To do this, we had to plane this central area, before installing 157 square meters SMA wearing course.
This time last year, FJ Groundworks offered us the opportunity to work on Haven Allhallows Holiday Park, where we laid a large area for new caravans. We were invited back this year to install another area, this time it was a footpath which required planing out before resurfacing
Recently, Evolution Enabling reached out for our assistance in installing 306 SMA wearing course in Fish Island, London. The area was based in an underground parking area, on one of the hottest days of the year, but out team worked hard and completed the install with ease.
Tay-dal had the incredible opportunity to carry out an install within Stanstead Airport. We were asked to install 1650 square meters of HDM road base, base course and HRA wearing course. This took us 4 days due to the limitations of who and what we could have on sight.





















