Before committing to a property, developers must assess available power, tenant demand, and utility timelines.
The Critical Loop Power-Ready Industrial Portfolio helps them plan for all three, starting with a six-building SRG campus in Long Beach. The @latimes has the story: latimes.com/b2b/commercial-r…
2
47
Relocatable battery systems can serve another project when grid upgrades arrive or demand shifts.
Here’s how we build for more than one address.
This week we launched the CLB-5100 Power System. Operations engineer Robert takes you inside the hardware. His favorite part about the job? Turning on a customer’s lights for the first time, and with Sares Regis Group, he’ll get to do a lot more of that.
Introducing the CLB-5100 Power System, launching with a 12 MW deployment that helps a Sares Regis campus in Southern California reach the 25 MW its tenant needs. SRG has named Critical Loop its industrial power solutions partner in the region for the next two years.
Read more: businesswire.com/news/home/2…
Our Power-Ready Industrial Portfolio puts certified battery storage and power controls on site before a tenant signs. Full power from day one, no utility wait, no stranded assets.
Let’s talk.
1
2
74
If your California project is waiting on power, look at flexible interconnection now. Substation slots are limited, and once they’re filled, you’re back to waiting years for the utility. Our Cygnus controller is approved to connect sites through PG&E’s Flex Connect. Message us.
We're on @FastCompany's 2026 Next Big Things in Tech list for Sustainability and Energy. It caps a big stretch: Cygnus just joined @PGE4Me's Flex Connect approved provider list, and we've added 50+ MWh of capacity for customers who couldn't wait years for power.
Full list: fastcompany.com/91612652/sus… #FCTechAwards
Cygnus, our software-defined power controller, has achieved CSIP 2030.5 certification and completed interoperability testing with @PGE4Me, joining its list of Flex Connect Approved Solution Providers.
With our existing UL 3141 listing, Cygnus is the first power controller to the market to hold both, with compatibility across PG&E and Southern California utilities.
2
3
254
The week, our team attended #ClimateWeekNYC 2026 ⚡Threading a few of our biggest takeaways from the event.
1
1
100
Replying to @EnergizeCapital
@EnergizeCapital named Critical Loop a Top 30 Digital Innovator in Electrify Everything 2026.
We’re the power expediters, delivering power years ahead of grid upgrades with domestic battery supply and integrated hardware and software.
Full report: energizecap.com/electrify-ev…
1
120
#ClimateWeekNYC brings a lot of great people together to talk about the future of energy. We're glad to be part of it.
We'll be in the city, hoping to connect with as many of you as we can in person.
In New York and want to talk shop? DM us.
1
78
A lot of companies are talking about the power problem. We're the ones fixing it, and we could use more hands.
Hiring engineers across hardware, manufacturing, quality, test, firmware, and electrical.
Equity, flexible health coverage, a 401(k), PTO we actually want you to take.
Open roles: criticalloop.com/careers
3
106
Our Head of Hardware, Chip Leigh, is speaking at the Rice Alliance Energy Tech Venture Forum in Houston on 9/17. It's a topic he lives day to day: testing hardware on a bench until it's proven, so it performs reliably the moment it reaches a real site.
Details: etvf.rice.edu #ETVF26
71
Two industrial facilities in California needed 20 megawatts, but the utility could only commit to 7.
Because the customer runs on shifts, battery storage covers the difference, dispatched by Cygnus, our grid-interactive controller.
The same approach runs the San Diego Airport project: 4MW of solar and 4MWh of batteries coordinated across a live campus, saving the airport millions over the contract.
Our CEO @rocket_bala talked through both projects this week on the Clean Power Hour pod with @tgmontague.
youtu.be/Ot-Hy-lkAy0?si=_DFY…
2
115