家漁ってたら面白いもの出てきたけど需要あるか?w家の暗所で保管はしていたけど状態分からないからあくまでも観賞用がメインかな…w
もし気になる方がいたらDMまで…
#20B #ロータリーエンジン
Replying to @OurFavOnlineDoc
What colour Simmons would go hardest on @jonpierre_ohyeah build? 👀🔥
#respost #simmonswheels #20b #carculture #simmonsaustralia
2.2 HECTARES AT MAITAMA MAIN
Land size: 2.2 hectares
Purpose: Mixed-use (Multi-purpose)
Title: FCDA CofO & RofO
Location: Maitama Main (directly on a tarred road in a serene environment).
Price: #20B
*FOR SALE:*
*100 Hectares Land at IDU industrial area, Abuja*
📐Land size : 100 Hectares
💷Price: #20B net
🗺️Location: iDU industrial area (2 minutes drive from train station 🚉)
🏯Purpose: Mixed use (Comprehensive development )
Can be used for either commercial or
*FOR SALE:*
*100 Hectares Land at IDU industrial area, Abuja*
📐Land size : 100 Hectares
💷Price: #20B net
🗺️Location: iDU industrial area (2 minutes drive from train station 🚉)
🏯Purpose: Mixed use (Comprehensive development )
Can be used for either commercial or
*FOR SALE:*
*100 Hectares Land at IDU industrial area, Abuja*
📐Land size : 100 Hectares
💷Price: #20B net
🗺️Location: iDU industrial area (2 minutes drive from train station 🚉)
🏯Purpose: Mixed use (Comprehensive development )
Can be used for either commercial or
*FOR SALE:*
*100 Hectares Land at IDU industrial area, Abuja*
📐Land size : 100 Hectares
💷Price: #20B net
🗺️Location: iDU industrial area (2 minutes drive from train station 🚉)
🏯Purpose: Mixed use (Comprehensive development )
Can be used for either commercial or residential
🗺️ Document: R of O
And it's available for search.
Google pin 📍
maps.app.goo.gl/7N42yh1M89xX…
Procedure:
1. Use google map go for inspection
2. write LOI
3. Meet with the owner
4. collect papers for search
5. make payment and sign documents
6 the property is 100 % delivable but note. No buyer no inspection and sighting of documents.
*FOR SALE:*
*100 Hectares Land at IDU industrial area, Abuja*
📐Land size : 100 Hectares
💷Price: #20B net
🗺️Location: iDU industrial area (2 minutes drive from train station 🚉)
🏯Purpose: Mixed use (Comprehensive development )
Can be used for either commercial or residential
🗺️ Document: R of O
And it's available for search.
Google pin 📍
maps.app.goo.gl/7N42yh1M89xX…
Procedure:
1. Use google map go for inspection
2. write LOI
3. Meet with the owner
4. collect papers for search
5. make payment and sign documents
6 the property is 100 % delivable but note. No buyer no inspection and sighting of documents.
Replying to @seyimakinde
@seyimakinde said @officialABAT economy is a voodoo economy. The "voodoo economy" has been giving the LGs in Oyo state #20b every month with the proper accountability from the governor. The way some Oyo people are ignorant of Seyi's manipulative character is more of a problem.
“Oyo Local Government Receives About #20 Billion Monthly. Where is The Money Going?”
Hon Sunday babalola
#20b – Hantavirus + Ebola Bio-Pressure Layer (Andes cluster resolved; Bundibugyo Ebola in DRC continues expanding).
(Both formalized in June–July 2026 updates)
#21 – Sustained directional accuracy (calibrated range held).
#22 – 9/11-scale asymmetric trigger with ritualistic motifs (Hot Window).
(Present from April 2026 structure; carried as elevated watch)
#23 – Great Deception layer (spiritual component — aliens/false lights/AI as mouthpiece, principalities).
(April 2026 onward; accelerating)
#24 – China/Russia multipolar alignment under pressure.
(April 2026 China oil-protection track; expanded July)
#25 – Compounding attrition with no clean off-ramp (Full Acceleration).
(Core from April 2026 trajectory; continuous)
#26 – Synagogue of Satan / shadow forces over Jerusalem.
(July 2026 formalization)
Live / Recent Nodes (Updated through 13 August 2026)
#27 – Greenland/Technate Buildout + AI Acceleration
Confirmed + Accelerating. Critical Metals developments ongoing. NVIDIA RTX Spark platform launched with shipments beginning fall 2026.
Early signals April–May 2026; confirmed accelerating June–July 2026 and continuing.
#28 – Iran Nuclear Gateway / Escalation Track
• Multi-night U.S. strike campaign placed “on a hold” after ~13 consecutive nights (late July 2026).
• Ukrainian long-range strikes hit Caspian vessels linked to Iranian-Russian cargo; Iran response posture elevated.
• Pickaxe Mountain (near Natanz) remains high-value threatened target.
• Israeli Cabinet approved pilot entry of U.S.-backed Gaza Peace Council / Board of Peace structures (26 July 2026).
• Antenna impression of nuclear event of some order involving Iran logged 17–18 July 2026.
• Iran waiting-out strategy toward ~2029 retained as supporting indicator.
• Prolonged-conflict pattern reinforced by Strait of Hormuz control claims and constrained shipping (10–11 August 2026).
#29 – Red Heifer / Temple Readiness Cluster
Active breeding programs (Shiloh and related) producing 2026 candidates (Galilee/Golan reports); some later disqualified by blemishes/ear tags; national Temple service training ~150,000 enrolled toward 200,000 target; Temple Institute altar readiness reported. Folded under eschatological / purity / Third Temple / Rev 11:3 readiness indicators. Incremental updates only.
#30 – Solar / Eclipse / Numerical Acceleration Markers (August 2026)
• Specific sunspot Earth-facing orientation in the August 8–10 window as cosmic marker aligned with the eclipse — timing hit.
• August 2026 eclipse geometry (including Jupiter positioning / 8–13° west references) as warning and acceleration signal.
• Numerical structure explicitly developed 10–11 August 2026: 11³ = 1331 linking Revelation 11:3 and 13:3; 10.8 ↔ 8.10 inversions and left-hand/right-hand path readings preserving 666 form.
• White House video symbolism (desk → throne of knives, headless eagle in stained glass, directed light flashes, sun hidden behind headless eagle as eclipse denotation) supporting acceleration framing — logged immediately after appearance.
#31 – Leadership / Ritual Framing
Substitute-king / eclipse ritual parallel patterns observed in high-level succession dynamics. Developed July–early August 2026.
#32 – Domestic Hard-Power Tooling
ICE G.L.O.V.E. electric-shock gloves procurement (no-bid, up to $20M, higher arrest-volume pressure) logged 11–12 August 2026 under domestic control-capacity cluster. Supporting indicator.
#33 – Phase Transition
Phase 1 Index tracking ceases in connection with 13 August 2026.
Phase 2 begins on 13 August 2026 (seals accelerating; Beast Kingdom track begins).
Explicitly stated mid-August 2026 prior to the date.
The hard prediction given concerned the transition into the rise of the Beast system.
Davido and MJ Autos don collect Agbabiaka, Abuja Car and Oilsiders bragging right 🤣🤣🤣
I love this una competition
But $15M??? That's like #20B+ 🤔
Replying to @OnoyomDavid @yabaleftonline
The same thought that came to my mind.
Bro #20b+ o
The sharp #20B of @codybracing waits to be pushed out for @AllStarSprints motor heat @FremontSpeedway
Replying to @KizzDaniel
Replying to @andreanimalidad
@andreanimalidad
Aún están los perros malviviendo en Jamundí. Carrera 41Isur #20B. Ciudadela Terranova.































