Arjun (@LOXMethane) header
Arjun (@LOXMethane) profile picture

@Arjunsssssssd 's alt Space ,Tech & Defence enthusiast

Joined July 2026
Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)
2
41
3,839
Arjun retweeted
Although Fate series has many routes/storylines, but 1) Fate/Zero . 2) Fate/Stay night : Unlimited Blade Works . are absolutely must watch
Fate : Unlimited blade works
1
3
14
840
1) Tata Electronics is exploring global EPC partnerships for Phase 2 expansion of its OSAT facility in Assam. 2) Kaynes Semicon: Planning a 4x expansion in OSAT capacity to 8–9 billion devices annually through a JV with Vishay intertechnology, The 2nd OSAT unit is 90% completed
20
146
1,409
" Our in-house actuators allows Vanars to perform with precision at the smallest scales "
The latest iteration of our in-house actuators allows Vanars to perform with precision at the smallest scales. Here’s one threading a needle.
7
144
1,635
Arjun retweeted
Trial runs for India's indigenously manufactured high-speed train on the 50-km Surat-Bilimora stretch of the Mumbai-Ahmedabad bullet train corridor will begin in April and May 2027
3
20
1
256
3,295
Trial runs for India's indigenously manufactured high-speed train on the 50-km Surat-Bilimora stretch of the Mumbai-Ahmedabad bullet train corridor will begin in April and May 2027
3
20
1
256
3,295
Arjun retweeted
🎶🎵 🎶
2
3
4
275
Arjun retweeted
Looks like MeitY has taken the Malaysia pill here, prioritising high-volume industry demand and lower-margin segments like OSAT/ATMP The signs were already there in NITI Aayog's 10-year semiconductor plan, which aims to establish India among the world's top 3 OSAT destinations .
The 12 projects approved under ISM1.0 will meet only 10% of India's chip demand by 2030. ISM2.0 aims to bridge this gap through larger, high-volume facilities MeitY is reviewing large OSAT proposals, prioritising larger facilities for high-volume demand,in lower-margin segments.
6
23
1
191
3,207
Looks like MeitY has taken the Malaysia pill here, prioritising high-volume industry demand and lower-margin segments like OSAT/ATMP The signs were already there in NITI Aayog's 10-year semiconductor plan, which aims to establish India among the world's top 3 OSAT destinations .
The 12 projects approved under ISM1.0 will meet only 10% of India's chip demand by 2030. ISM2.0 aims to bridge this gap through larger, high-volume facilities MeitY is reviewing large OSAT proposals, prioritising larger facilities for high-volume demand,in lower-margin segments.
6
23
1
191
3,207
Arjun retweeted
The 12 projects approved under ISM1.0 will meet only 10% of India's chip demand by 2030. ISM2.0 aims to bridge this gap through larger, high-volume facilities MeitY is reviewing large OSAT proposals, prioritising larger facilities for high-volume demand,in lower-margin segments.
1
18
1
119
4,393
The 12 projects approved under ISM1.0 will meet only 10% of India's chip demand by 2030. ISM2.0 aims to bridge this gap through larger, high-volume facilities MeitY is reviewing large OSAT proposals, prioritising larger facilities for high-volume demand,in lower-margin segments.
1
18
1
119
4,393
Although Fate series has many routes/storylines, but 1) Fate/Zero . 2) Fate/Stay night : Unlimited Blade Works . are absolutely must watch
Fate : Unlimited blade works
1
3
14
840
Arjun retweeted
With signs of possible Tata Fab-2, the important question is what chip nodes it will produce ?? Considering Fab-1 caters to the 110–28nm range, Fab-2 is likely to target more advanced nodes below 28nm. If it can reach 12–14nm, that would open doors to much bigger opportunities.
Tata Electronics holds early talks to raise up to $2 bn in loan tranches for semiconductor expansion. First tranche up to $800 mn at ~SOFR+180 bps. Dholera fab targets 50,000 wafers/month; project cost ₹91,000 cr.
4
22
194
3,155
With signs of possible Tata Fab-2, the important question is what chip nodes it will produce ?? Considering Fab-1 caters to the 110–28nm range, Fab-2 is likely to target more advanced nodes below 28nm. If it can reach 12–14nm, that would open doors to much bigger opportunities.
Tata Electronics holds early talks to raise up to $2 bn in loan tranches for semiconductor expansion. First tranche up to $800 mn at ~SOFR+180 bps. Dholera fab targets 50,000 wafers/month; project cost ₹91,000 cr.
4
22
194
3,155
Budget smartphone processors, automotive electronics, Telecom & networking devices , industrial computing and edge-AI chips etc etc are possible opportunities
2
2
26
495
Arjun retweeted
PSLV - The Workhorse of ISRO
1
5
2
27
1,907
Test videos of their reaction control engine from their website.
6
66
1,622
Arjun retweeted
Absolutely 10/10. Probably one of the best piece of media I’ve ever watched. I’d been sitting on it for so long, assuming it was just some kind of slice-of-life or romance stuff but I couldn't have been more wrong
10
4
3
36
1,665
Modi's manufacturing report card. The 1.9-trillion-rupee ($20 billion) flagship Production Linked Incentive Scheme seems to be coming of age. Read my latest India Edition (gift link) bloomberg.com/news/newslette…
38
234
17
864
106,068
Arjun retweeted
All of this is coming from Micron's Sanand ATMP facility, which is still in its early production stage , by end-2027, it is expected to reach 728 million units annually. Phase 2, of similar scale, has received environmental clearance, with its construction partner also selected.
India's Memory Chip Exports, (Brick By Brick)
7
78
2
455
9,898