
@Arjunsssssssd 's alt Space ,Tech & Defence enthusiast
Joined July 2026
- Tweets4.1K
- Following103
- Followers792
- Likes10.7K
Arjun retweeted
Although Fate series has many routes/storylines, but
1) Fate/Zero .
2) Fate/Stay night : Unlimited Blade Works .
are absolutely must watch
Arjun retweeted
Trial runs for India's indigenously manufactured high-speed train on the 50-km Surat-Bilimora stretch of the Mumbai-Ahmedabad bullet train corridor will begin in April and May 2027
Track trials of India's indigenous bullet train expected by mid-2027; first service begins late 2027 economictimes.indiatimes.com…
Arjun retweeted
Looks like MeitY has taken the Malaysia pill here, prioritising high-volume industry demand and lower-margin segments like OSAT/ATMP
The signs were already there in NITI Aayog's 10-year semiconductor plan, which aims to establish India among the world's top 3 OSAT destinations .
Arjun retweeted
The 12 projects approved under ISM1.0 will meet only 10% of India's chip demand by 2030.
ISM2.0 aims to bridge this gap through larger, high-volume facilities
MeitY is reviewing large OSAT proposals, prioritising larger facilities for high-volume demand,in lower-margin segments.
Arjun retweeted
With signs of possible Tata Fab-2, the important question is what chip nodes it will produce ??
Considering Fab-1 caters to the 110–28nm range, Fab-2 is likely to target more advanced nodes below 28nm.
If it can reach 12–14nm, that would open doors to much bigger opportunities.
Arjun retweeted
Absolutely 10/10.
Probably one of the best piece of media I’ve ever watched.
I’d been sitting on it for so long, assuming it was just some kind of slice-of-life or romance stuff but
I couldn't have been more wrong
Arjun retweeted
Modi's manufacturing report card.
The 1.9-trillion-rupee ($20 billion) flagship Production Linked Incentive Scheme seems to be coming of age.
Read my latest India Edition
(gift link)
bloomberg.com/news/newslette…
Arjun retweeted
All of this is coming from Micron's Sanand ATMP facility, which is still in its early production stage , by end-2027, it is expected to reach 728 million units annually.
Phase 2, of similar scale, has received environmental clearance, with its construction partner also selected.
Arjun retweeted
Replying to @SkyrootA
@SkyrootA has demonstrated India's private orbital launch capabilities , @AgnikulCosmos targets partial reusability by H1 2027, @Astrobase aims for maiden launch of Medium lift launch vehicle by 2028 & reusability by 2030, while @theguildworld targets full reusability by 2028–29.
Replying to @HQuarterma43504
Would you call it delusional if i say that I'm preety satisfied with how space programme turned out and tho I'm worried but not blackpilled about the future of our space programme
Arjun retweeted
And the things is that this isn't the case with Electronics only
Automobiles, Engineering goods, Machineries, pharma, semiconductors , railways and etc etc
All of these are going through capacity build-up & when they all starts to contribute , the numbers will be simply amazing
Arjun retweeted
This is when much of our electronics capacity build-up and expansion is yet to come online or is still in its early stages of production
Take PCBs, the biggest contributor to H1 FY2026-27 growth
Production is expected to rise from $0.6 billion in FY2024 to $3.8 billion by FY2029
India's electronics exports jumped by 44% to ~$32 billion in the first half of 2026-27. But the heartening story is that non-smartphone electronics exports grew by 56.5% to $13.79 billion, faster than phone exports at 35.8%.
manufacturing.economictimes.…
Arjun retweeted
How do you inspect and maintain a reactor no human can ever enter?
@PranosFusion is building tokomaks, where maintenance must be fully remote. @armatrix_IN builds snake-like robotic arms for exactly those tight spaces.
Building fusion's supply chain from India 🇮🇳🦾⚛️
Watch 👇

















































