Arjun (@LOXMethane) header
Arjun (@LOXMethane) profile picture

@Arjunsssssssd 's alt Space ,Tech & Defence enthusiast

Joined July 2026
Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)
Arjun retweeted
Although Fate series has many routes/storylines, but 1) Fate/Zero . 2) Fate/Stay night : Unlimited Blade Works . are absolutely must watch
Fate : Unlimited blade works
1
3
14
840
" Our in-house actuators allows Vanars to perform with precision at the smallest scales "
The latest iteration of our in-house actuators allows Vanars to perform with precision at the smallest scales. Here’s one threading a needle.
7
144
1,636
Arjun retweeted
Trial runs for India's indigenously manufactured high-speed train on the 50-km Surat-Bilimora stretch of the Mumbai-Ahmedabad bullet train corridor will begin in April and May 2027
3
20
1
256
3,295
Arjun retweeted
🎶🎵 🎶
2
3
4
275
Arjun retweeted
Looks like MeitY has taken the Malaysia pill here, prioritising high-volume industry demand and lower-margin segments like OSAT/ATMP The signs were already there in NITI Aayog's 10-year semiconductor plan, which aims to establish India among the world's top 3 OSAT destinations .
The 12 projects approved under ISM1.0 will meet only 10% of India's chip demand by 2030. ISM2.0 aims to bridge this gap through larger, high-volume facilities MeitY is reviewing large OSAT proposals, prioritising larger facilities for high-volume demand,in lower-margin segments.
6
23
1
191
3,207
Arjun retweeted
The 12 projects approved under ISM1.0 will meet only 10% of India's chip demand by 2030. ISM2.0 aims to bridge this gap through larger, high-volume facilities MeitY is reviewing large OSAT proposals, prioritising larger facilities for high-volume demand,in lower-margin segments.
1
18
1
119
4,393
Arjun retweeted
With signs of possible Tata Fab-2, the important question is what chip nodes it will produce ?? Considering Fab-1 caters to the 110–28nm range, Fab-2 is likely to target more advanced nodes below 28nm. If it can reach 12–14nm, that would open doors to much bigger opportunities.
Tata Electronics holds early talks to raise up to $2 bn in loan tranches for semiconductor expansion. First tranche up to $800 mn at ~SOFR+180 bps. Dholera fab targets 50,000 wafers/month; project cost ₹91,000 cr.
4
22
194
3,155
Arjun retweeted
PSLV - The Workhorse of ISRO
1
5
2
27
1,907
Test videos of their reaction control engine from their website.
6
66
1,622
Arjun retweeted
Absolutely 10/10. Probably one of the best piece of media I’ve ever watched. I’d been sitting on it for so long, assuming it was just some kind of slice-of-life or romance stuff but I couldn't have been more wrong
10
4
3
36
1,665
Modi's manufacturing report card. The 1.9-trillion-rupee ($20 billion) flagship Production Linked Incentive Scheme seems to be coming of age. Read my latest India Edition (gift link) bloomberg.com/news/newslette…
38
234
17
864
106,068
Arjun retweeted
All of this is coming from Micron's Sanand ATMP facility, which is still in its early production stage , by end-2027, it is expected to reach 728 million units annually. Phase 2, of similar scale, has received environmental clearance, with its construction partner also selected.
India's Memory Chip Exports, (Brick By Brick)
7
78
2
455
9,898
Arjun retweeted
Replying to @SkyrootA
@SkyrootA has demonstrated India's private orbital launch capabilities , @AgnikulCosmos targets partial reusability by H1 2027, @Astrobase aims for maiden launch of Medium lift launch vehicle by 2028 & reusability by 2030, while @theguildworld targets full reusability by 2028–29.
Replying to @HQuarterma43504
Would you call it delusional if i say that I'm preety satisfied with how space programme turned out and tho I'm worried but not blackpilled about the future of our space programme
4
7
1
48
761
Arjun retweeted
Highly recommended Name : Monster
2
1
2
17
2,404
Arjun retweeted
And the things is that this isn't the case with Electronics only Automobiles, Engineering goods, Machineries, pharma, semiconductors , railways and etc etc All of these are going through capacity build-up & when they all starts to contribute , the numbers will be simply amazing
5
28
561
Arjun retweeted
This is when much of our electronics capacity build-up and expansion is yet to come online or is still in its early stages of production Take PCBs, the biggest contributor to H1 FY2026-27 growth Production is expected to rise from $0.6 billion in FY2024 to $3.8 billion by FY2029
India's electronics exports jumped by 44% to ~$32 billion in the first half of 2026-27. But the heartening story is that non-smartphone electronics exports grew by 56.5% to $13.79 billion, faster than phone exports at 35.8%. manufacturing.economictimes.…
4
39
187
3,847
Arjun retweeted
Serial Experiments Lain
Highly recommended Name : Monster
2
4
1
24
1,465
How do you inspect and maintain a reactor no human can ever enter? @PranosFusion is building tokomaks, where maintenance must be fully remote. @armatrix_IN builds snake-like robotic arms for exactly those tight spaces. Building fusion's supply chain from India 🇮🇳🦾⚛️ Watch 👇
7
46
4
178
3,906
Humanoids by General Autonomy
3
41
599
9,214
Arjun retweeted
Battery cell manufacturing in india : 🟢 Commissioned Capacity - 1) OLA electric : > 6 GWh Commissioned > NMC & LFP > targets 20 GWh by 2028 > Long term target - 100 GWh 2) Exide > 6 GWh Commissioned > NMC & LFP > Addition 6 GWh planned Total - 12 GWh Capacity Commissioned
8
40
1
298
11,236