
π¨π¦π΅π ENTP, he/him. Enthusiastic about cities, housing, and transit. Founder, @SkyTrain4Surrey οΌ Co-Founder, Build the #SFUGondola.
Surrey, British Columbia
Joined May 2012
- Tweets15.4K
- Following1.9K
- Followers1.2K
- Likes33.4K
Daryl DC π
ππ‘π retweeted
REALITY CHECK β HOW FAST CAN SKYTRAIN TO NEWTON BE BUILT? Lessons from Three Past SkyTrain Projects
skytrainforsurrey.org/2026/1β¦
#surreybc #bcpoli #vanpoli #vanre #TransLink
Daryl DC π
ππ‘π retweeted
Premier Lorne Doerkson cites the Newton #SkyTrain extension in naming Surrey-Newton MLA Harj Dhaliwal to directly work with #TransLink.
He specified his government is not merely "contemplating" the project, it has "committed." #bcpoli #vanpoli
dailyhive.com/vancouver/premβ¦
Daryl DC π
ππ‘π retweeted
The lesson is not just to give existing LRTs transit signal priority.
Itβs to stop building at-grade transit.
We are not mature enough to operate at grade transit in Toronto.
At the cost to make this a half-tunneled LRT-Subway Frankenstein we could have just gone elevated with a proper metro technology.
Daryl DC π
ππ‘π retweeted
MEDIA RELEASE β SKYTRAIN ADVOCATES APPLAUD UNANIMOUS SUPPORT FOR NEWTON SKYTRAIN, CALL OUT MISINFORMATION ON COSTS + TIMELINE
Surrey City Councillors voted unanimously last week to endorse SkyTrain to Newton!
#surreybc #bcpoli #vanpoli #vanre #translink
skytrainforsurrey.org/2026/1β¦
Daryl DC π
ππ‘π retweeted
COMPARING SKYTRAIN TO NEWTON TO TRANSLINK'S KING GEORGE BLVD BRT
- Completion of Newton SkyTrain possible in 2032-2035
- BRT from Newton to S. Surrey only could be 1/3 cost
- Significant misinformation on timelines, costs
#surreybc #vanre #translink
skytrainforsurrey.org/2026/1β¦
Daryl DC π
ππ‘π retweeted
Surrey City Council unanimously backs SkyTrain extension to Newton π
dailyhive.com/vancouver/surrβ¦
Daryl DC π
ππ‘π retweeted
Sydney Metro West is going to be a step up for Metro in Sydney:
π Longer carriages 21.49m (up from 20.25m)
π Wider trains 3.2m (up from 3.05mm)
π 4 doors per carriage (up from 3)
Daryl DC π
ππ‘π retweeted
Six days after Sydney's new airport opened, the 13km @SydneyMetro extension opened to Bankstown. Today would have been a very satisfying day for Transport for NSW executive @HowieCollins.
Daryl DC π
ππ‘π retweeted
It only takes 80 minutes on the Sydney Metro from Bankstown to Tallawong using the new Southwest Metro.
That's 31 stations and 66kms travel.
An average speed of 49.5km/h including station stops!
That is quick π
#SydneyMetro
Daryl DC π
ππ‘π retweeted
BC NDP showed #SkyTrain extension projects are good politics.
With that in mind, Lorne Doerkson's Conservatives should think bigger by providing strong provincial leadership and direction in long-term planning. #bcpoli #vanpoli #vanre
dailyhive.com/vancouver/bc-nβ¦
Daryl DC π
ππ‘π retweeted
Opinion: BC NDP showed SkyTrain extensions are good politics, and the Conservatives should think bigger
dailyhive.com/vancouver/bc-nβ¦
Daryl DC π
ππ‘π retweeted
Shame on TIME for ignoring years of foldable innovation from Samsung, Huawei, OPPO, and other Chinese brands, only to spotlight Appleβs first foldable as if the category started there.
People expected the most polished, refined foldable ever. Instead, they got what it actually is: a first-generation product that still needs time to mature.
Apple will adapt fast. Give it another 2β3 generations, and it will likely catch up.
But thatβs exactly the problem: overhyping a brand and blindly praising it creates unrealistic expectations. Then the entire tech community wonders why the hype feels disconnected from reality.
Daryl DC π
ππ‘π retweeted
Samsung just sliced an Apple in half.
But this video carries a much deeper message.
Samsung is reminding Apple and the entire industry that it has been building foldable phones since 2019, refining the technology generation after generation.
The timing is no coincidence. With Apple's first foldable iPhone on the horizon, Samsung is making its position clear.
Apple may be preparing to enter the foldable market, but Samsung has already spent years shaping it.
And the final line says it all:
"Years ahead in Foldables."
This is more than a product advertisement. It's a statement of technological confidence, and a direct challenge to Apple.
Daryl DC π
ππ‘π retweeted
MEDIA RELEASE β SKYTRAIN TO NEWTON MUST COME FIRST, AHEAD OF SKYTRAIN TO UBC β and begin construction within the next 4 years.
SURREY VOTERS HAVE SPOKENβand now they expect incoming governments to deliver.
skytrainforsurrey.org/2026/1β¦
#translink #bcpoli #ubcx #vanpoli #surreybc
Daryl DC π
ππ‘π retweeted
Apple literally mocked other foldables at its launch event, saying vertical scrolling feels compromised and watching movies means dealing with oversized black bars that make the screen much smaller.
Now look at Apple doing the same thing, and suddenly Apple fans and some influencers are defending it. LMAO. The hypocrisy is unreal.
Daryl DC π
ππ‘π retweeted
MEDIA RELEASE β SKYTRAIN ADVOCATES WELCOME COMMITMENTS TO SKYTRAIN TO NEWTON
Elevated SkyTrain would reduce transit travel times from Surrey City Centre to Newton to 10 minutes or less, and could carry 55-60k riders per day.
skytrainforsurrey.org/2026/1β¦
#surreybc #translink #bcpoli



















