Miner Reddy retweeted
$IREN Mackenzie UPDATE:
More angles of NEW expansion, staging yard, and workers camp for your viewing pleasure. Notice, equipment for expansion is already being staged.
Miner Reddy retweeted
$IREN Mackenzie UPDATE/CORRECTION:
Based on new footage of Mackenzie, I am changing my opinion of what the trench and pipes are running along the rear of the data hall. The trench itself is a concrete cable trough for the fiber-optics network. The orange temp buildings you see circled in the new photo are where the workers are building ladder trays for the fiber to enter the building. The pipes that are spaced out equally every 5ft or so are most likely drainage pipes.
Mackenzie UPDATE:
$IREN looks to be laying the groundwork for liquid cooling at Mackenzie while the air-cooled retrofit is still underway.
Drone footage from 9/23 shows black 2" to 3" rigid pipe entering the data hall wall at regular intervals along an open trench that runs the length of the building.
It looks like supply and return branch lines for a liquid cooling system. If you look closely, they go from the wall into buried trunk lines running parallel to the data hall for a future liquid-cooling loop, going in at the same time as the air-cooled GPU fit-out.
Why this is smart sequencing:
Miner Reddy retweeted
🚨BREAKING NEWS🚨 10/24 footage confirms massive expansion is underway at $IREN's Mackenzie site in BC.
Will @danroberts0101 discuss this on the 11/5 earnings call?
More details to come!
Miner Reddy retweeted
The notion that GPU debt and data center financing is *closed* is laughable.
As of now, the world is separated between those who say they know, and those who actually know.
If @jvisserlabs is right, intel is more valuable than equity, so let me tell you this:
selective credit markets means the due diligence goes beyond your traditional ways of finding out the winners from the losers.
I will gladly go on the record here and say that based on my latest, the debt markets are not closed for $IREN.
Best of luck to the others.
Miner Reddy retweeted
I’ll be watching the upcoming $IREN earnings closely
I think the market is getting overtly emotional with neoclouds
Miner Reddy retweeted
WELL, WELL, WELL? $IREN is the only name on this Southwest Power Pool (SSP) chart with a contracted service agreement.
Public Service Company of Oklahoma row: “IREN service contracted” (dark green).
That’s the 1.6 GW Oklahoma campus. Grid studies done, power from 2028.
Everything else is pending or undisclosed, so while the rest of the queue waits, IREN already has the service locked.
Power + land + DCs + GPUs + cloud. 150k GPU path. Multi-GW pipeline.
(Table: @ModoEnergy 🙏)
Miner Reddy retweeted
$IREN is down 62% from ATHs
meanwhile, the machine keeps getting stronger:
1. AI cloud revenue grew 4x in two quarters
2. contracted ARR climbed from $2.3B → $4.0B
3. $MSFT accepted $IREN’s first liquid-cooled datacenter
the market is pricing an investment cycle like a structural decline
Miner Reddy retweeted
$HUT at 21x fwd rev (none earned yet; starts post-build). No wonder @ashergenoot & goons pump this BS. I’m better off with queen $IREN
finance.yahoo.com/markets/st…
@FransBakker9812 @Agrippa_Inv @blockspace
Miner Reddy retweeted
Replying to @SmallCapSnipa
Miner Reddy retweeted
Dear @elonmusk , there’s this super AI factory called $IREN which will soon have material amounts of compute for rent 👍🤓🚀
Replying to @elonmusk
This describes the conversation SpaceX has had when we have tried to rent inference compute from AWS, GCP or anyone at, so that we can shift load off our training clusters!!
Miner Reddy retweeted
Replying to @SemiAnalysis_
Miner Reddy retweeted
Know what you own.
Flushes like this are not by choice.
Decade long data centers are not weekly investments.
Stay strong frens.
$IREN
Miner Reddy retweeted
$IREN Prince George UPDATE: 10/9 Footage
Halls are numbered 1-4 starting from the top down. Lots of progress has been made and redundancy added.
More detailed posts to come breaking down different parts of the site. Stay tuned!
The site is a little chopped up due to the limited amount of space, however each segment and hall are quite similar to the Mackenzie site.
Miner Reddy retweeted
A layer you can’t inspect is a layer you can’t predict, automate or recover when it fails.
That’s why full-stack control matters for anyone operating an AI factory.
Mirantis k0rdent AI delivers it through a composable platform that integrates components of NVIDIA DSX OS™, the open, modular software portfolio of the NVIDIA DSX AI Factory Platform, into an interoperable stack operators can inspect, extend and adapt.
NVIDIA Run:ai provides AI workload and GPU orchestration within NVIDIA DSX OS - and it is now open source. By extending its integration to include NVIDIA Run:ai, Mirantis gives operators a consistent operational model from bare-metal provisioning and lifecycle management to workload orchestration and GPU allocation.
See what full-stack control looks like. buff.ly/phVSI8a
#Mirantis #k0rdentAI #NVIDIA #Runai #OpenSource @nvidia
Miner Reddy retweeted
Amazing $IREN content from Prince George, by @AceKicker13.
Happy to see all 4 data halls being operational.
Now we wait for the official Horizon 2 handover. 😎
$IREN Prince George UPDATE: Thermal imaging shows all 4 data halls and the two substation transformers are humming and drawing significant power. Its raining so some of the heat signature is distorted.
More Prince George site specific updates to come. Lots going on there!
Miner Reddy retweeted
$IREN Prince George UPDATE: Thermal imaging shows all 4 data halls and the two substation transformers are humming and drawing significant power. Its raining so some of the heat signature is distorted.
More Prince George site specific updates to come. Lots going on there!
Miner Reddy retweeted
决定取消订阅某些SemiXX报告了,觉得很多时候总喜欢“搞个大新闻”,写的东西特别misleading—理论上或许没错,但是完全不考虑实际情况
其实研究报告@FundaAI 写的确实比较中肯
Miner Reddy retweeted
$IREN: The Misconception Around Yields and a Harsher Financing Environment
It’s no secret that $IREN's vertical approach of developing and owning 100% of its data center footprint is more capital intensive than what most other neoclouds are doing by colocating / renting data centers from third parties.
The wrong conclusion to draw from this is that $IREN would therefore be disproportionately affected by a tougher financing environment because of its particular strategy.
In a supply-constrained market, cost increases tend to get passed downstream, often with a markup if suppliers have enough pricing power to maintain their margins.
Think of company X having 75% margins, $100 in revenue and $25 in costs. Now those costs increase by $5, to a total of $30. To maintain the same 75% margin, the company would have to increase revenue to $120.
In other words, a $5 cost increase just resulted in a $20 price hike downstream.
Obviously, market forces ultimately decide whether a company can get away with passing through that kind of increase or whether margins have to take a hit. The more leverage the supplier has, the easier those increases become.
Today, the data center market is still extremely tight, so one should expect higher financing costs for new developments to eventually work their way into the rates colocation tenants, including neoclouds, have to pay.
Now consider that a tougher financing environment also means lenders become more selective about who they are willing to finance in the first place. Fewer developers securing capital means fewer projects getting built, which would further exacerbate an already severe compute and data center shortage.
Whoever still manages to bring capacity online in that environment should therefore have significant pricing power, potentially allowing them to absorb higher financing costs while keeping margins steady or even expanding them.
If you haven’t already derived the conclusion I’m trying to get across, neoclouds that rely heavily on colocation could actually end up materially worse off in a tougher financing environment.
Keep in mind that these agreements are also commonly structured around very long commitments, often 10-20 years, meaning an increase in the cost of securing capacity can stay with the tenant for a very long time.
$IREN obviously isn’t immune to higher rates or harsher financing conditions.
But a company with an established track record of repeatedly delivering large infrastructure projects should have a materially easier time accessing capital than smaller data center developers with less scale and a weaker execution history.
One of the biggest risks for a lender financing a new development is completion risk. If the project runs badly over budget, gets delayed or never gets delivered at all, the economics behind the loan can fall apart and the lender may eventually be left holding the bag.
That is why, at this point, one of the biggest priorities for $IREN and its shareholders should simply be continuing to deliver these data center projects and building an increasingly strong track record behind them.
It’s also worth pointing out that $IREN is taking a pretty clever approach to data center financing that substantially changes the risk profile for lenders.
So far, the company has not relied on traditional construction financing secured against a new data center before the facility is built. Instead, IREN has been funding construction at the corporate level and then looking to raise data center financing once the facility is operational, contracted and generating cash.
That is a completely different proposition for a lender.
Instead of underwriting a development that exists largely on paper and hoping it eventually gets delivered, the lender can finance an operating asset with physical infrastructure already in the ground and contracted cash flows already coming through the door.
The capital released from that financing can then be recycled into portions of the next build, which can subsequently be financed once operational, creating the financing flywheel I’ve discussed several times before.
This strategy is inherently much more lender-friendly.
And once you look at the executive team behind it, the structure starts to look a lot less accidental and a lot more deliberately engineered by people who have spent decades around large-scale infrastructure financing.
$IREN has an unusual amount of Macquarie DNA inside its leadership team. Macquarie Asset Management oversees over $500b globally and was ranked the world’s largest infrastructure investment manager by AUM in 2026.
Both Co-CEOs have backgrounds at Macquarie, as does CCO Kent Draper, while CFO Anthony Lewis spent 22 years there before joining $IREN.
Anthony in particular is worth highlighting. Before joining $IREN, he served as Co-Treasurer of Macquarie Group, one of the most senior positions within the firm’s treasury and finance organization, overseeing global funding, liquidity and capital management.
So when $IREN comes up with a financing structure that minimizes construction risk for lenders and allows capital to be recycled from one completed build into the next, that strategy is being put together by a team with decades of experience doing this kind of thing.
There probably aren’t many executive teams in the neocloud space with more direct experience navigating large-scale infrastructure financing and capital markets.
If anybody has the right people to navigate through a challenging financing environment, it’s $IREN.
Dear Prime Minister Ambani,
Please accept my humble apologies for not realizing that you are the real boss of India.
Naturally, you would prefer to maintain your monopolistic exploitation of the great people of India, but would you nonetheless consider allowing Starlink to compete?
There are many areas of India, as there are in all countries, with no Internet access, which denies children the opportunity for education and for small businesses the opportunity to sell their goods to a global market. Starlink would change their lives for the better.
Thank you 🙏