$NUAI wouldn’t surprise me if we finally got a deal this coming week.
On November 12, management publicly confirmed advanced lease negotiations, exclusivity with a leading global technology company, and that the tenant was already helping procure long-lead equipment. The decision to self-execute was also made at the tenant’s request and reportedly accelerated contracting.
We’re now nearly three weeks removed from that call and entering the final month of Q4.
It’s also worth remembering that management explicitly said Phase 1 can move forward independently of Phase 2. We don’t necessarily need the air permit to get our first deal.
December could be a very big month for NUAI shareholders. I feel very grateful to own 5,200+ shares 🙏
Block retweeted
Alright, after sitting with Leopold's letter for the past 24 hours, here are my thoughts...
To start off, it seems quite obvious that SALP believes they know more about AI than the rest of the market. In 2024, they predicted how aggressive the compute buildout would be, and I think Leopold feels as if he is simply smarter than the rest of the market because of that initial thesis coming to fruition.
The problem is, the market is very humbling.
This entire letter was an acknowledgment of the humbling that the fund took in July by being directionally correct about the buildout but being so arrogant about leverage, timing, and most importantly -- their book of shorts -- which Leopold acknowledged was one of the main reason they got hurt in July. The fund may have been able to withstand a 50-60% drawdown, but their shorts going against them is what really took them out. This is important because as you go through the letter, you basically hear a short case for the entire market besides a few sectors...if he's wrong on this short case, his long assumptions may not have the exponential S curves he's assuming to actually be proven correct.
So, as I am reading through the letter, you can't help but feel that this guy thinks of his opinions and logic around AI as fundamentally different from the rest of the market. Now, the obvious paradox exists: if you are so smart, why did you blow up? If you fund spends $20M on Claude tokens, how could you have lost this much capital? Maybe it's not just because of SALP underestimating the forces of market participants...maybe it's because they actually aren't that smart.
I have a deep respect for the research and analysis presented in this letter, but I am also not impressed.
1. This entire letter is 160 pages of marketing for Anthropic. The fund is up 15x on it's position and because of the July blow up, Anthropic is really the only position they have that has any meaningful level of gains. Every assumption in the letter goes back to the frontier labs being the ultimate winner and it simply reads as someone talking their book but not just talking about it, being absolutely obsessed and convinced that their book will not be wrong. This is scary. It's one thing to have conviction, it's another thing to have biases that translate into every argument converging back to your thesis.
2. Since the entire letter is based around marketing Anthropic, it means that everything that competes with Anthropic...is a loser. I mean seriously...what are we doing here? All software goes to zero. Tesla and SPCX will be run by a better ASI than Elon...lol. Gold is worthless due to asteroid mining (which probably needs SPCX I'd imagine...lol) and real estate is irrelevant because Robots will build houses. ASML will be competed away by agents that can better design the architecture for building chips. It genuinely feels like the point of the letter is to say the most enduring moats for incredibly important businesses will go away in a few years because of Anthropic. There is an argument that MSFT office is gone because of Anthropic...that Apple's iPhones will be eaten away by new types of ASI devices...the whole thing requires so many assumptions of how consumers behave, how enterprises behave, how people interact with each other to completely be overwritten. It's just really, really hard to believe.
3. The neoclouds are the greatest businesses ever. The assumption in the letter is the only thing that will hold its value are timeless artifacts like the Mona Lisa, memory companies because of how valuable memory is to AGI, and the companies that can sell spot compute. Leopold explains that due to RSI, neoclouds selling compute for Nvidia's older chip, the H100, at $5/hr will eventually be able to sell it at $100/hr based on how much demand will be there. I just find this hard to believe. The practicality of debt, dilution, cost of capital...all of this is ignored due to the rising demand Leopold speaks of, which essentially means he thinks most companies will just converge into things that Anthropic will do, meaning they will need more compute. What if this isn't true? What if Anthropic can't do all the things that other companies do...how does the market for compute and neoclouds become as exponential as he claims and even if it does, why don't the largest hyperscalers simply benefit even more if the demand is that strong? Why are GOOGL MSFT AMZN not the highest quality companies at that point given their ability to finance? The practical understanding of much of the points in this letter simply don't match the excitement of the claims.
Ultimately, this letter feels like someone who wants the world to go in the direction that they think its going to go in. As a result, they aggressively pitch ideas and assumptions that probably aren't going to be true but create such a doomsday scenario for anything other than their ideas that it builds a significant amount of hype for what their version of AI looks like. Some elements of it may become real, many other elements of it feel like concepts that are grasping for a big idea but don't really have the ability to deal with basic market forces like cyclicality, consumer behavior, the cost of capital, etc.
I began reading this letter and was optimistic on learning about new assumptions for what an AI world would look like. I got to the end of it feeling like there was only one winner if the letter was right, Anthropic, and everything else didn't matter or would be destroyed in this new ASI world. Those claims feel so far fetched and unreasonable that if Leopold is right, he deserves to make a ton of money. If he is wrong, or if he more likely isn't as right as he thinks he is, then many of the companies he pitches as going to zero will survive, they will create compounding levels of value, and they will benefit from this technology as humanity adapts to an AI world vs one or two companies being the only beneficiary of that AI world.
I am about 30 pages into the Q3 Situational Awareness letter. The full letter is 160 pages.
All I can say so far is that if Leopold is right about where he sees AI going...the disconnect between market valuations across the AI stack and the level of growth we should expect is one of the largest disconnects we have ever seen in financial markets.
Some of these predictions are quite hard to believe, but I guess that's also the point of his fund. He writes, "Either we or the market will have an extraordinary amount of egg on the face in a year."
Will post deeper thoughts tomorrow after reading through the whole thing, the most interesting insights so far: he thinks the frontier labs will do $1T of ARR by end of 2027, a ChatGPT moment for Robotics will come by late 2027, and that RSI is significantly being discounted by the market which could end up becoming so strong that it could lead to the shutdown of all models by the government.
We are living in one of the craziest times to be an investor.
Block retweeted
Leopold Aschenbrenner explains where to invest for the next big 3 year AI trade
His Q3 investor letter says the market is underestimating the speed AI moves from chatbots to agents to superintelligence
He expects 2027 to pack 3 years of AI progress into 1 year
his letter focuses around these companies/stocks:
• Foundation Models: Anthropic is the main bet because the model itself becomes the product. Situational Awareness LP (SALP) says Anthropic ARR grew ~80x in 22 months, from ~$1B to ~$81B, and argues leading AI labs could exit 2027 at $1T+ combined revenue run-rate
• Memory Chip Supply: SK Hynix, Kioxia, and SanDisk benefit if long-running AI agents make memory and storage more valuable. Leopold says reinforcement learning and agents make AI chips limited by memory, which is why he viewed Hynix as a $100B company that could become a $1T company
• GPU Rentals: SpaceX, Nebius, SharonAI, CoreWeave, and IREN benefit if AI labs keep renting short-term GPU capacity at higher prices. SALP says an H100 used to earn ~$1-$2/hour, now earns ~$5-$10/hour, and could reach $100s/hour+ if superintelligence demand hits
• Datacenter Power Supply: Bloom Energy benefits if AI datacenters pay more to get power online faster. AI buildout needs more than cheap power, it needs power immediately
• Robotics: Robotics becomes the next major theme if AI starts doing real-world labor. Leopold says frontier models are starting to beat specialist robotics models, which means the next advancement may come from better AI models
Leopold warns software companies, AI wrappers, chip designers, and even today’s AI winners may lose their moats once AI can replace the engineers, code, IP, and management they are valued on
Stocks to own:
• Anthropic $ANT
• SK Hynix $SKHY
• Kioxia $KXIAY
• SanDisk $SNDK
• SpaceX $SPCX
• Nebius $NBIS
• SharonAI $SHAZ
• CoreWeave $CRWV
• IREN $IREN
• Bloom Energy $BE
Stocks to avoid:
• Salesforce $CRM
• Adobe $ADBE
• ServiceNow $NOW
• C3.ai $AI
• Synopsys $SNPS
• Arm $ARM
• Nvidia $NVDA
• AMD $AMD
• Broadcom $AVGO
• ASML $ASML
Block retweeted
$NUAI Worth $34.01 to $35.75 with signed P1, P2
As a follow up to the other day, I wanted to discuss the Northland Securities price target for TCDC and put my own spin on it.
Key Assumptions:
1) Rent - $riot signed $ant for $130 per month with a 3% escalator. My base case is $135-140 because $NUAI will not only provide powered pads but will handle modular DC construction, earning a premium.
2) PUE - Northland acknowledged 1.1 PUE being used in the $riot deal, and I'm using it for that reason.
3) Ownership - Remember @VistraCorp gets a 5% cut for the 207 MW but not for the 550 MW because its BTM
4) Cap Rate - Using 9.1% or 11x multiple vs 10% or 10x multiple because treasuries continue to reverse course and $ant has more cash than all of its hyperscaler peers. The credit risk for a powered land lease is a drop in the ocean and $ant could burn $200B and still have $37B of cash.
5) DSO - My key point of contention with Northland; the fully diluted share count as of earnings was 160m. There is almost zero chance that Ted warner will sell shares for an average of $10 with a vWAP of $15 for his RSUs. It would have to be a last resort, and I don't see that happening after execution of these two Phases.
My best guess right now is a convertible bond with a capped call structure that will raise $600m and cap dilution up to $20 per share or 30m new shares.
6) Discount Rate - My discount rate incorporates execution risk, time value of money and regulatory risk. We know that Phase 1 already has all of its permits complete and is exempt from ERCOT. Phase 2 is an air permit away from making TCDC the most valuable site in Texas given the PUCT / ERCOT uncertainty with a new Governor.
Will this go to $34-$36 right away? Almost certainly no, but the same logic applies to price targets in excess of $50 for $riot by @MorganStanley
This is the most misunderstood opportunity that I've ever owned. The deals need to close but when they do, people will see what I see.
If SpaceX succeeds in making life multiplanetary and harnessing even a millionth of the Sun’s energy, it will be worth about a million times the current global economy.
These are obviously absurdly difficult goals, but there is a path to achieving them.
I recommend holding on to your shares.
Block retweeted
$NUAI some raw thoughts before Thanksgiving.
We ran from $1.5 -> $4.49 in a couple weeks during historic market weakness. Today it feels like the sector bottomed.
$NUAI has 3 catalysts coming up. P1 lease. Air Permit. P2 lease.
P1 lease alone is worth $10+. P1+P2 combined worth $30+. Just look at $RIOT economics.
If NUAI somehow times the sector bottom with the best deal seen in the sector so far, the leg up will be explosive and rapid. Shorts will go broke.
Life is complicated but when simplified, it comes down to only a few critical decisions that decide the rest of your life.
$NUAI happens to be one of those decisions for me. I have a good feeling about the next 30 days.
Stay Hard. Happy Thanksgiving.
Block retweeted
An update to my post from earlier this year. Three things stand out to me.
1) I am always surprised by how little AI capacity has actually been energized to-date. Adding up the table, these 9 companies have ~33GW of AI capacity announced (using the floor figures) and ~0.5GW energized. That's about 1.5%. $NUAI has 0MW energized, but so do $FRMI, $HUT and $KEEL, at $1.3-14B EVs. Most of this group is still valued on capacity that isn't online yet.
2) The NUAI analyst targets look like Phase 1 values to me. The 5 targets run $6-$17, avg $11. That's an implied EV of ~$676M-$2.2B vs ~$283M today, or 2.4x-7.9x. Phase 2 is very much in play with TCEQ now issuing permits once again. As a reminder, Phase 2 is 2.7x of Phase 1, in terms of MWs, and much more in terms of equity value.
3) Nobody is paying for New Mexico. NUAI holds an option on ~3,500 acres in Lea County, NM, announced in Nov 2025 as a future 7GW AI hub. It's only an option: $200K paid, no tenant, power contract or permit on record, and it isn't mentioned in the Q3 10-Q, release or call. It doesn't belong in a valuation today, and I haven't seen an analyst note that includes it. At ~$283M EV the market isn't paying for it either.
Will let others draw their on conclusions from this, but this has been an interesting view of the market, over time.
Not investment advice.
I prepared this chart to illustrate the severe mispricing in $NUAI.
Current EV: ~$260M
Peer average EV: $8.1B
That gap? Massive mispricing for a company with 8GW announced AI capacity - Expected energization of Phase I in 2027 - pure behind-the-meter power buildout, and no grid queue nonsense.
Peers like $IREN ($15.7B EV, 4.6GW), $APLD ($9.9B, ~1.5GW), $CIFR ($8.9B, ~4.2GW), $HUT, $WULF etc. are getting huge credit for announced hyperscaler deals. But reflect on this: Even though they've inked those deals, the vast majority of their capacity remains in construction, with energization timelines mirroring or a year ahead of $NUAI's 2027 expected timeline.
Execution risk cuts both ways—yet the market prices $NUAI for total failure while rewarding peers well before energization.
Downside protected by powered land value alone.
Upside explosive on first hyperscaler deal.
The yellow arrows and the dotted red line tell the story.
$NUAI
Block retweeted
$NUAI
BREAKING NEWS.
Texas regulators are resuming environmental permits for data centers.
texastribune.org/2026/11/17/…
Whats the only thing blocking NUAI P2? TCEQ Air permit.
You've been warned. 🔥
Block retweeted
Over the past week, I’ve been overwhelmed by the love and support of friends, industry colleagues, and people I've never met. Thank you to everyone who has shown kindness to my family and me. It means the world to me.
I came to the United States 53 years ago, and becoming an American citizen is one of the greatest gifts and proudest moments of my life. NVIDIA has been my life’s work. Building it into the company it is today alongside my colleagues has been a privilege and an honor. Nowhere but in America could a company like NVIDIA be possible. I love our country, and I love NVIDIA.
I did not live up to the standards expected of everyone at NVIDIA, and I have made serious mistakes in my personal life. I created problems for the Board that I deeply regret. I own my mistakes completely, and I am committed to cooperating with the Board’s independent investigation.
Since my departure, I’ve seen an outpouring of calls from NVIDIA’s employees, investors, business partners, and customers for me to return as CEO. Many continue to reach out to me directly as the company navigates complex technology, market, competitive, and geopolitical dynamics. NVIDIA is a once-in-a-generation company. If the Board of Directors decides that my return is in the best interest of our shareholders, our employees, the company, and America, I would be honored to answer these calls and return as CEO.
Thank you again to everyone who has shared their good wishes. I am profoundly humbled by your support. To my family: I love you, and I will spend the rest of my life being worthy of yours.
Jensen
Block retweeted
$NUAI – FOR EVERYONE WHO WANTS TO UNDERSTAND THE NUAI INVESTMENT CASE AND WHY I’M SO BULLISH. 🔥
I genuinely believe the next 60 days could completely transform NUAI, and I think the market is massively underestimating what’s coming.
Here’s what I’m expecting before mid-January:
First, a definitive 207MW lease agreement, potentially with Anthropic, on terms comparable to RIOT’s recent deal. If the agreement isn’t ready immediately, a binding LOI could be an intermediate step.
Second, approval of the air permits for the additional 550MW.
And finally, another agreement covering Phase 2, potentially bringing the total to 757MW under long-term contracts.
Remember, NUAI has already disclosed a non-binding LOI covering BOTH phases with the SAME prospective customer.
Now look at the valuation.
At my recent reference market cap of approximately $437M, NUAI reported $187M in total cash, including restricted cash, only $20M in outstanding debt and no convertible notes.
It already has 207MW of firm power secured through a 20-year agreement with Vistra.
And RIOT’s recent $28 BILLION AI infrastructure agreement demonstrates just how valuable long-term contracted capacity can become.
I’ve said this repeatedly: being late to the AI infrastructure race could turn out to be NUAI’s biggest advantage. No billions in legacy mining debt, no massive GPU investment requirements, and the opportunity to structure deals around today’s market conditions.
My personal bullish price expectations:
207MW signed: $12–15.
757MW contracted with attractive economics and financing: $20–25+.
And yes, I believe this could happen before January 15, 2027. That’s my prediction, not a guarantee.
NOW HERE’S WHAT I REALLY ENCOURAGE EVERYONE TO DO.
Don’t just follow the share price or other people’s opinions. Spend an hour understanding the actual business.
1. Read RIOT’s $28B agreement. Understand the economics and capital-efficient structure.
riotplatforms.com/riot-platf…
2. Read NUAI’s 20-year Vistra agreement. Understand the importance of securing 207MW of firm power.
globenewswire.com/news-relea…
3. Read NUAI’s Q3 earnings release. Pay attention to the LOI covering both phases, the balance sheet and the progress toward a definitive lease.
sec.gov/Archives/edgar/data/…
4. Most importantly, LISTEN to NUAI’s November 12 earnings call. Hear management explain the negotiations, financing and development plans.
edge.media-server.com/mmc/p/…
I believe once you understand all four, you’ll see why I’m so bullish.
The market is focused on 207MW. I’m looking at the potential for 757MW.
Read the agreements. Listen to management. Connect the dots.
Then make up your own mind.
I’m extremely bullish, and I’m holding. 🔥
Block retweeted
A second look into my highest upside holding $NUAI.
for more great $NUAI coverage;
@lovedropv @bitcoinbutcher1 @smallcapsnipa @fnitefiend and @alexiswrem1747 @ChairmansLedger
Block retweeted
$NUAI Some Saturday morning thoughts..
NUAI hasn’t signed its first lease yet. Most people read that as a weakness. I think right now it’s one of its biggest advantages.
No legacy fleet. No sunk capex in old designs. No billions already spent that need justifying.
NUAI gets to start on the new model.
The old model: traditional data centers typically run ~$12-15M per MW in capex.
The new model: $RIOT’s Corsicana lease targets ~$6M per IT MW in developer capex, including reimbursements for modular infrastructure.
On Thursday’s call, CFO Ted Warner: “we expect Phase 1 build costs to be less than half that of a comparable traditional development.”
LESS THAN HALF.
When Northland asked if this looks like the RIOT structure, Warner called it “a similar-looking structure.” And Phase 2 is expected to have a similar build cost.
The numbers aren’t perfectly comparable. The direction is clear.
The deck has a slide titled “Capital-Efficient Delivery Model.” Three levers:
Build cost below 50% of traditional
The timing of capital outlays limits upfront funding
The tenant is helping procure long-lead items
Management’s stated goal: limit how much New Era has to fund, even right after a Phase 1 lease is signed.
Now the balance sheet:
$187M total cash, $49M of it unrestricted.
$138M restricted, including approximately $118M supporting the letter of credit securing 207 MW of power for 20 years.
Once a lease is signed: up to $200M of Macquarie financing, plus the option to restructure the LC and release restricted cash.
Here’s why this matters for $NUAI shareholders.
Traditional data center development requires enormous upfront capital. Without sufficient project financing, that capital often comes from issuing equity.
For NUAI, capex per MW is potential dilution per MW.
Halve the build cost, push the outlays later and let the tenant carry procurement, and you could substantially reduce the number of shares needed to reach first rent.
Ted Warner said they are “focusing on maximizing our return on equity dollars.”
That’s the right priority for a company at this stage.
The next winners in AI infrastructure may not be the ones spending the most. They may be the ones spending the least per MW delivered... and it helps to have 207MW of power coming online in 2027 ;)
Block retweeted
$NUAI 🚀 Bullish takeaways from Ted Warner at Cantor Convergence + analyst upgrade:
🟢 P1: 207 MW — FULLY PERMITTED. Existing air permit secured. Protected under a registered private-use network, meaning P1 is NOT subject to Texas’s Batch Zero process. No waiting in the grid interconnection queue.
🟢 Modular Economics — Less than HALF the cost of traditional $12–14M/MW builds, while maintaining attractive rental rates. Potentially massive yields on cost.
🟢 RIOT-Style Structure — Management wants to pursue a similar low-capex modular approach, potentially reducing financing needs and dilution.
🟢 Analyst Upgrade — Price target raised $7 → $17 (+143%), largely driven by dramatically lower projected dilution.
🟢 Share Count — Fully diluted share estimate reduced from 461M → 201M (-56%).
🟢 Equity Requirements — Projected equity needs fall from $1.43B → $275M (-81%).
🟢 Lease Timing — Management targeting execution well ahead of 12/31/26.
207 MW fully permitted and outside Batch Zero. Lower capex. Less dilution. $17 analyst target before lease execution.
The setup for a major rerating is getting stronger. 🔥
Block retweeted
I agree with @jiahanjimliu on the hit to Chinese compute capabilities.
The China diversion story has a second-order effect that gets less attention: near-term oversupply risk for NVIDIA.
Pre-ban, China was ~20% of NVIDIA revenue (FY2024) and ~95% of the advanced AI accelerator market there. Official sales have since collapsed toward zero for restricted chips. On volume, Epoch AI’s median estimate is ~660k H100e smuggled through end-2025 (customs data points higher, ~1M+). Against ~9M H100e of AI compute NVIDIA shipped in 2025, that is roughly 7–13% of a peak year’s output — material, but not the majority.
NVIDIA has simultaneously extended large residual-value guarantees and capacity backstops across the ecosystem (including major commitments tied to OpenAI and neoclouds). Reporting from the WSJ and others shows Jensen drove much of this financing activity to keep demand clearing the supply pipeline.
When a non-trivial slice of production finds its way into gray-market or remote channels while official China demand is largely offline, the remaining buyers have to clear a larger share of the output. That increases reliance on credit support and residual-value guarantees to sustain the flywheel, and pressures incremental unit economics.
I continue to believe GPU/hr prices will continue to rise because the bottleneck isn’t chips. It will be power and datacenters, the foundation of compute. $IREN was smart for sure for waiting, but to be clear, it was a gamble, albeit on very good odds.
The installed base is still heavily $NVIDIA. The marginal economics look more fragile.
Impact of China GPU Tightening
The US will tighten both export to China and China remote access to GPUs in SE Asia. @KashRamki dug into the figures and 60-60% of Chinese compute is Nvidia.
New shipments have fallen, market share of shipments pre-ban 95% and fell 34% but 34% is still significant!
This is:
1. Bearish Chinese open source labs.
2. Bearish GPU prices but neutral GPU rental prices.
- All 2027 powered datacenters have been planned, any planning now will not result in 2027 datacenters! Thus the amount of GPUs available on market will be limited by datacenters which were already set in stone.
- This is bearish semiconductor manufacturers and bullish Neoclouds. Neoclouds earn the spread of GPU rental prices - GPU prices. If the amount of GPUs available on market is constant from datacenter availability and GPU prices come down, everyone who did not "secure" their VR200s, will benefit!
In $IREN's earnings call, @danroberts0101 talked about securing GPUs late because prices may not fall. What a genius!
Block retweeted
$NUAI 🚀 One of NUAI's most underrated advantages? No legacy Bitcoin mining business to carry into the AI era.
Ted Warner made an interesting point at Cantor Convergence about why former BTC miners trade at a discount to traditional data center operators.
It's not just about revenue or megawatts. It's about risk, diversification, and how much investors are willing to pay for each dollar of income.
🟢 Clean Slate — No legacy mining fleet, BTC exposure, or competing mining operations to manage.
🟢 Pure-Play AI Infrastructure — Investors can value NUAI based on contracted lease economics rather than mining profitability.
🟢 Horizontal Diversification — Ted discussed expanding through 40–50 MW projects instead of concentrating risk across multiple gigawatt-scale campuses.
🟢 Higher-Quality Tenants — Opportunities with investment-grade banks, trading firms, and inference customers.
🟢 Higher Valuation Potential — A diversified portfolio of reliable tenants could eventually command the premium valuations enjoyed by established data center operators.
Here's why that last point matters:
Imagine NUAI generates $100M in annual operating income.
At an 8.5% cap rate, investors value those assets at ~$1.18B.
But if NUAI builds a diversified portfolio of high-quality tenants, investors might accept a lower 6% cap rate, valuing those SAME assets at ~$1.67B.
That's 42% more asset value without generating a single additional dollar of income.
The difference? Investors are willing to pay more for income they consider safer and more predictable.
The bull case isn't just that NUAI can grow earnings. It's that every dollar of those earnings could eventually become worth MORE. 🔥
Block retweeted
$NUAI 🦢🔥🚀
THE UGLY DUCKLING IS TURNING INTO A BEAUTIFUL SWAN!
Not long ago, NUAI was the ugly duckling nobody wanted to touch.
Lawsuits, accusations of fraud, financing concerns, endless skepticism and short sellers betting against its future.
But while most people were focused on its ugly past, something remarkable was happening behind the scenes.
A new management team. Experienced industry professionals. Strategic partnerships. Permits. 207MW secured with Vistra. Another 550MW in development. And advanced negotiations with a potential hyperscaler tenant.
Piece by piece, the ugly duckling was growing into something completely different.
Then came Riot’s massive $28 BILLION Anthropic agreement, showing just how valuable secured power and modular AI infrastructure can become.
And last week’s NUAI earnings call put even more pieces of the puzzle together.
One tenant. Exclusivity. Economics reportedly agreed. A potentially much stronger ownership structure. And management describing construction economics comparable to Riot’s approach.
Suddenly, the bigger picture became much clearer!
The binding lease is still missing, but I believe the transformation is already well underway.
The market is finally beginning to see what some of us have believed in for months.
The ugly duckling was never meant to stay ugly. It was growing into a beautiful swan all along. 🦢
And the shorts are still betting against the duckling!
I’ve never been more bullish on $NUAI! 🔥🚀
🤖 Made with AI
Block retweeted
$NUAI Phase 1 Signed is Worth $10 Today
Inspired by my friend @SmallCapSnipa publishing the Northland sell side analysis, I found it appropriate to keep it simple and stick to the same format.
Warning: this analysis is for Phase 1 only, and does not include Phase 2 or Phase 3 at TCDC that will at a minimum power 1.2 GW or 6x Phase 1.
Now let's talk through some assumptions before you read the output I produced attached.
1) Rent - $riot executed for $130/kw/Month with $ant but my base case is $140 due to $NUAI being responsible for development and construction of the modular data centers versus just the powered pads and a later LOI date in September as power became harder to find in 2027
2) PUE - Northland is far too conservative as the $riot deal is 1.1. The initial LOI asked for 756 MW IT but landed on 910 MW IT because $ant opted for a simpler modular build and will be able to adjust power down during peak temperatures but will pay for the max capacity. My base case is 1.35 for now.
3) NOI / Ownership - 99% NNN and 95% for Vistra 5% share.
4) Multiple - Northland uses at 10 cap or 10x multiple but I find that cash return too high and believe 11x is more appropriate as a 9.1% cap rate is almost 4% higher than the 5.35% average of the 10 year and 20 year treasury. That's a very wide credit spread and the multiple should likely be 11.5x or 12.0x.
5) Build Cost - Same $6m assumption with 80% debt assumed.
6) DS0 - Used fully diluted shares of 160m from earnings to be conservative
7) Discount - Northland uses 11% for 2 years for a 2028 delivery but that's far too conservative as I believe delivery will be Q4 2027 given the modular build. That said, I upped the discount to 20% for one year for time value of money and execution risk.
Ted Warner just telegraphed Phase 1 delivery and most likely Phase 2 at the Cantor panel to mitigate regulatory risk upon approval of the company's air permit by starting construction as soon as possible.
I've never been more bullish on a setup because management is keeping it super simple which will result in accelerated institutional adoption as the deal structure can be digested in 5 minutes. See $riot performance following their deal versus peers.
Load up. Final call.
NFA DYOR
Block retweeted
A few quick thoughts on the $NUAI earnings call:
As expected, one tenant, under exclusivity, and management says there is "full agreement on what the economics are going to look like." If it's anything like Riot's, which they confirmed was the case on the call, then we're in for some pretty stellar economics.
First modules September 2027, ready for service Q4 2027, in line with expectations for power from Vistra.
I was pleased to hear that the JV developer was removed at the tenant's request. The tenant wants to deal with NUAI directly, and NUAI keeps the economics a developer would have taken. That's a big shift from some sort of 50-50 economics split with Stream. We keep you keep 95% of the pie, with the other 5% going to a partner who is now motivated to deliver more power for a Phase 3 at TCDC. That's pretty huge!
Also, Macquarie's lease deadline is no longer an issue. Macquarie waived its repayment right for the missed Oct 8 deadline, and the PIPE paid off $60M of loans. About $20M of debt is left, fully cash-backed. Of course, this hurt investors to raise at the high $2s. A self-inflicted and unexpected wound.
This one was interesting: some of the $118M tied up in the Luminant LC could come back. The CFO said that once the lease is signed there are options to restructure the LC and release restricted cash. If ~$35M comes back, most of the near-term dilution goes away.
There is a lot of FUD on X around Phase 2. It's clearly moving, and fast! Mgmt expects the air permit by year-end as TCEQ is processing permits again and turbines arrive Q4'27-Q1'28. That last part tells me everything I need to know.
The stock has been responding very favourable in light of this commentary. Even the unfortunate news around Jensen couldn't hold $NUAI back.
Steady as she goes.
NFA
$NUAI has released its Third Quarter 2026 Business Update.
Highlights include:
✓ 207 MW of firm, contracted power
✓ Power availability expected in Q3 2027
✓ Initial ready-for-service targeted for Q4 2027
✓ In advanced negotiations on the Phase 1 lease documentation under a non-binding LOI covering TCDC Phases 1 and 2
✓ Site preparation underway
✓ Strengthened liquidity to support TCDC development
✓ Proposed Phase 1 modular build: preliminary cost estimate below half that of a comparable traditional build
“Responsible development has guided our approach from day one. That means designing power arrangements to avoid additional transmission costs for ratepayers, using water responsibly and giving local communities a voice. We want Texans to have a seat at the table and local residents and businesses to share in the opportunities TCDC creates,” said Charlie Nelson, Chairman and CEO of New Era.
Management will host a business update call and webcast on Thursday, November 12 at 8:00 a.m. ET to discuss the Company’s recent business developments and operational progress.
Register here: edge.media-server.com/mmc/p/…
investors.newerainfra.ai/new…
Block retweeted
I spent the day analyzing $RIOT's Corsicana lease with a Frontier AI Lab, and what a similar deal could mean for $NUAI.
Here are the facts on Corsicana:
- 910 critical IT MW on 1 GW gross. $130/kW-mo, escalating 3%/yr, billed on the full 910 MW whether used or not. Tenant can flex usage seasonally within the 1 GW load.
- $28B over the 15-year initial term ($54B with extensions). ~33% average unlevered yield on cost (!!)
- Capex: ~$2M/MW for the HV/MV power pad (~$1.8B), plus up to $4M/MW reimbursed to the tenant for modules (~$3.6B), paid per phase only after modules are delivered.
- Delivery: 400 MW Sep 2027, 200 MW Jan 2028, 310 MW Jul 2028. Rent starts no later than 60 days after each block is delivered.
- Equipment: first 400 MW substation is operating. No backup generation, so no air permits needed.
- Financing: base case is 80-90% LTC non-recourse project debt ($4.4 to 4.9B) on tenant credit. I believe they will have negotiated a fallback strategy if financing doesn't come to fruition.
This deal is a paradigm shift and the new gold standard for every datacenter developed out there.
Here's my read-through to $NUAI (my napkin math):
- TCDC in Ector County has 207 MW of Luminant power come Q3 2027 (Vistra gets 5% of the Phase 1 project company) and ~500 MW more planned on behind-the-meter gas.
- On the Riot structure at ~690 IT MW and $125/kW-mo: ~$19B of contract value, ~$1.3B average NOI, ~31% unlevered yield on cost. Tenant funds the modules, project debt funds most of the pad, and the equity check is under $100M.
- At a 10x NOI, with a 40% haircut on Phase 2 for the air permit, turbines and timing, I get ~$27/share in a base case, against ~$2 today, with ~10% dilution at current prices. That's $11/sh on Phase 1 alone.
Of course, it all hinges on what mgmt can deliver. NUAI still has to sign a tenant and Phase 2 needs an air permit that Texas won't process until the ERCOT audit wraps December 10th.
Q3 results and call on tap tomorrow at 8am ET.