Read. Count. Measure. Price. Done. ✅
Drop in your drawings and SupplyLoop counts the doors and windows, measures every room to scale, traces the walls and turns it into a priced BOQ in minutes.
DM us “drawings” and we’ll show you a demo.
🔗 supplyloop.ai
The estimator priced your cement on Tuesday. From the price list you sent in August.
A PDF is right the day it's sent. The bill gets priced later.
On SupplyLoop, your live rate is there as they price it.
Verified suppliers only. Free to list.
supplyloop.ai/suppliers
1
11
Replying to @moinvirani
built for the people who actually run the job: estimators, QS, procurement, site, suppliers. We’re live! 🚀
106
SupplyLoop retweeted
Today we're launching @SupplyloopAI
The AI operating system for construction. From the first drawing to the last snag.
Drop in your drawings, run Auto Takeoff, get a priced BOQ on real supplier rates. Then buy materials and track progress, all in one place.
Demo 👇
Replying to @Arcfunminiyi
Fluted walls leave very little room for error on site.
What tolerance do you ask the contractor to hold on the flutes?
4
Replying to @I_BuildSmart
Good point. Do you check the thickness with pegs or a level before compaction, or after?
2
Replying to @davidgcant
Agreed. The best toolbox talks I've seen were mostly questions, not a lecture.
Who gets the most out of it on your sites, the foreman or the newest starter?
1
Replying to @kayzed_model
Photos of the conduit and pipe runs before the pour are cheap insurance.
Do you do a final walk with the plumber and electrician together?
Showroom first, local production of doors and windows later.
That's how a materials brand tests a new market before it commits to a factory.
For contractors the real win comes in phase two: shorter lead times and fewer import delays.
International building-materials company ABC Group has entered the Kenyan market with the opening of its first showroom, ABC Hauz, along Mombasa Road in Nairobi.
The company plans to explore local production of furniture, doors and windows within the next two years.
64
Replying to @CollinsOmo30163
The 135 degree hook is the detail that gets skipped because it's slower to tie, and it's the first thing to open up when it matters. Does anyone actually check hook angles before the pour on your sites?
3
Replying to @SanketSanki
Payment plans tied to construction only build trust if the progress updates behind them are real site photos, not renders. How often do you send buyers a proper site update?
3
Replying to @RahmanMayowa
No MEP drawing means the routes get decided by whoever reaches site first. Then the plumber is cutting where the electrician already chased. Coordination on paper is always cheaper than coordination on the wall.
1
Replying to @imran_services
Same rooms, very different cost drivers. The duplex adds decking, stairs and formwork, but it needs less roof and foundation area. On a tight plot the gap can be smaller than clients expect. What difference do you usually see between the two?
2
Replying to @Edmond2321
And log every rejected truck with its ticket number. When the full pour shows up on the supplier's invoice a month later, that record is what settles it.
1
Replying to @JoeyNelson2022
Writing the viewing distance and the lighting into the standard is the part most teams skip. Without it every walk turns into a Level 5 argument. Do you put it in the subcontract too, or just the punch standard?
1
1
3
4. Price the risk, then show it.
A named contingency line is easier to defend than a padded rate.
5. Re-quote before you resubmit. Never reuse a 60 day old price.
What would you add?
2
3. Flag long lead items on day one.
Transformers, lifts, escalators and generators often run past 12 weeks (Turner & Townsend). Get dated quotes early and put the lead time in your qualifications.
1
3
2. Ask for a fluctuation clause on metal and energy heavy packages.
Currie & Brown says these clauses are becoming common on longer UAE programmes. MEP, facades, steel and aluminium are taking the biggest hit.
1
2
1. Match your validity to theirs.
If your steel supplier gives you 30 days, don't offer the client 90 on that package. Split validity by package, not one date for the whole bid.
1
33